NIO for "Up-gradation and necessary repairing in Servo mechanism of 630KVA Servo-Stabilizer” of Power House USHP-II Kangan" |
USHP-II/GD/326-27 |
03.01.2023 |
|
USHP-II Kangan |
Electromechanical |
Power House |
3.18 lacs |
15 days |
NIO
|
Quotation for "Supply of Spares and Consumables" |
USHP-II/GD/302-05 |
28.12.2022 |
|
USHP-II Kangan |
Electromechanical |
Power House |
3.00 lacs |
15 days |
NIO
|
Quotation for "Supply of T&P" |
USHP-II/GD/306-09 |
28.12.2022 |
|
USHP-II Kangan |
Electromechanical |
Power House |
15.00 lacs |
15 days |
NIO
|
Extension for "Survey, Design, Detailed Engineering and Cost evaluation/estimation for Supply, Installation, Testing and Commissioning of
Trash Rake Cleaning Machine (TRCM) at Lower Jhelum Hydroelectric Project (LJHP), Gantamulla, Baramulla." |
GD/LJHP/Tech/75-84 |
2022_SPDC_193661_127.12.2022 |
2022_SPDC_199535_1 |
LJHP |
Civil |
LJHP Power House |
14.00 Lacs |
60 days |
Ext Notice
|
Extension for "Supply, Installation, Testing and Commissioning of Digital Water Meter from Forebay to Power House Ganderbal." |
GDG/T/100-09 |
27.12.2022 |
2022_SPDC_199535_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
2.30 lacs |
30 days |
Ext Notice
|
Extension for "Renovation of Beat Quarters at Forebay, RD 40000 and Headwork’s Preng of Power House Ganderbal. " |
GDG/T/89-99 |
27.12.2022 |
2022_SPDC_199525_1 |
Generation Division, Ganderbal |
Civil work |
Power House Ganderba |
1.99 lacs |
30 days |
Ext Notice
|
Extension for "Motorization of Sindh gate at Headwork’s Preng of Power House Ganderbal." |
GDG/T/79-88 |
27.12.2022 |
2022_SPDC_199519_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
3.54 lacs |
30 days |
Ext Notice
|
E-NIT for "Providing and Laying of MS Chequered Plates over the Exposed Cable Trenches of Outdoor Yard at Power House Ganderbal. " |
GDG/T/126-35 |
27.12.2022 |
2022_SPDC_200888_1 |
Generation Division, Ganderba |
Electrictromechanical/Civil, |
Power House Ganderbal |
15.04 lacs |
30 days |
E-NIT
|
E-NIT for "Comprehensive Annual Maintenance Contract (CAMC) of Data Centre ,JKPDC,Jammu " |
JKPDC/DC-AMC/2889-93 |
24.12.2022 |
GEM/2022/B/2901001 |
Data Centre,JKSPDC. |
AMC Services |
Corporate Office,JKSPDC,Satwari,Jammu |
Rs.50,20,000.00/- |
24 Months |
E-NIT
|
E-NIT for " Budgetary offers for Supply of new door rollers complete set for passenger lifts of Power house BHEP-I Chanderkote." |
GD/BHEP-I/1038-39 |
22.12.2022 |
2022_SPDC_198426_1 |
Baglihar HEP Stage I |
Mechanical work |
Chanderkote Ramban |
|
|
E-NIT
|
E-NIT for " Budgetary offers for supply of Aqua make 150HP submersible pump set for D&D system of Power house BHEP-I Chanderkote." |
GD/BHEP-I/1033-35 |
22.12.2022 |
2022_SPDC_198426_1 |
Baglihar HEP Stage I |
Electro Mechanical work |
Chanderkote Ramban |
|
|
E-NIT
|
E-NIT for " Budgetary Offer for Supply of Gossen Metrawatt make A2000 multifunctional energy meters for Generating Units of Power house BHEP-I Chanderkote." |
GD/BHEP-I/1033-35 |
22.12.2022 |
2022_SPDC_198426_1 |
Baglihar HEP Stage I |
Electrical work |
Chanderkote Ramban |
|
|
E-NIT
|
E-NIT for "Procurement of Consultancy for Detailed Design Review" |
JKPDC/Mohura HEP/PMC/8357 |
22.12.2022 |
2022_SPDC_198426_1 |
MOHURA HEP |
PMC |
MOHURA BARAMULLA |
Rs 3,98,130.00/- |
42 Months |
E-NIT
|
E-NIT for "Balance work of Stone Masonary retaining wall at RD 500m of Main Access Road NGHEP, near house of Mohammad Ismail Ganaie R/0 Dobipora Ganderbal" |
e-NIT No: 01 of 2022-23 |
17.12.2022 |
|
NGHEP GANDERBAL |
CIVIL |
GANDERBAL |
Rs 3,98,130.00/- |
20 days |
E-NIT
|
E-NIT for "Restoration of Main Access Road at Damaged Spot RD 44000-45000 ft of OLD Ganderbal SP Canal near Malhar Hitech Nursery. " |
e-NIT No: 01 of 2022-23 |
17.12.2022 |
|
NGHEP GANDERBAL |
CIVIL |
GANDERBAL |
Rs 978709.0 |
25 days |
E-NIT
|
E-NIT for "Replacement of 3-phase damaged Changeover and other allied works at RD 40000 of Power House Ganderbal." |
GDG/T/110-19 |
16.12.2022 |
2022_SPDC_199544_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
0.58 lacs |
30 days |
E-NIT
|
E-NIT for "Supply, Installation, Testing and Commissioning of Digital Water Meter from Forebay to Power House Ganderbal." |
GDG/T/100-09 |
16.12.2022 |
2022_SPDC_199535_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
2.30 lacs |
30 days |
E-NIT
|
E-NIT for "Renovation of Beat Quarters at Forebay, RD 40000 and Headwork’s Preng of Power House Ganderbal. " |
GDG/T/89-99 |
16.12.2022 |
2022_SPDC_199525_1 |
Generation Division, Ganderbal |
Civil work |
Power House Ganderba |
1.99 lacs |
30 days |
E-NIT
|
E-NIT for "Motorization of Sindh gate at Headwork’s Preng of Power House Ganderbal." |
GDG/T/79-88 |
16.12.2022 |
2022_SPDC_199519_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
3.54 lacs |
30 days |
E-NIT
|
E-NIT for "Proper lighting, renovation of electric wiring around all beats from forebay to head works preng by using LED Lights including Divisional office at Power House Ganderbal." |
GDG/T/69-78 |
16.12.2022 |
2022_SPDC_199518_1 |
Generation Division, Ganderbal |
Electrical work |
Power House Ganderba |
2.89 lacs |
30 days |
E-NIT
|
E-NIT for "APPOINTMENT OF COST ACCOUNTING FIRM / PRACTICING COST ACCOUNTANT(S) FOR PREPARATION OF COST ACCOUNTING RECORDS OF JKSPDCL FOR THE FINANCIAL YEARS (2019-20), (2020-21) & (2021-22)" |
NO: JKSPDCL/FIN/8621-24 |
14.12.2022 |
GEM/2022/B/2858675 |
CORPORATE OFFICE. |
FINANCE |
JAMMU & KASHMIR |
|
240 days |
1.GIST
2.FRESH E-NIT
|
E-NIT for "1.Construction of CGI shed at Kangan store for housing of machinery minimum size 40’ x 20’." |
CID/PDC/Sgr/07 of 2022-23. |
13.12.2022 |
NIL |
Kangan. |
CIVIL |
NIL |
5.838 Lakh |
45 days |
E-NIT
|
E-NIT for "Dismantling of Gypsy huts at Margund Store including shifting of dismantled material to Divisional Store CI&D Bemina" |
CID/PDC/Sgr/07 of 2022-23. |
13.12.2022 |
NIL |
Kangan. |
CIVIL |
NIL |
1.983 Lakh |
25 days |
E-NIT
|
E-NIT for "Repair / Restoration of Unit – I of MHEP Pahalgam by way of carrying of following works:
1.) Dismantling of Gear Box and toothed geared coupling and its accessories.
2.) Fabrication and installation of Turbine Coupling key.
3.) Inspection / Checking of rotating parts.
4.) Re-installation, re-alignment testing and commissioning of Unit – I.
5.) Fabrication, supply, installation, testing & commissioning of Toothed Geared Turbine Coupling of Shaft dia 180mm between Gear box and Turbine of machine 1st at MHEP Pahalgam".
|
GTD/PDC/TS/305 – 13 |
10.12.2022 |
2022_SPDC_199188_1 |
MHEP Pahalgam |
Mechanical |
Pahalgam Powerhouse |
7.20 Lacs (Estimated) |
Fifteen (15) Days |
E-NIT
|
E-NIT for "Supply, Installation, testing and Commissioning of Air Preheater/Air dryer and Auto drain valves in existing Compressed air system of Power house BHEP-I, Chanderkote, J&K UT". |
GD/BHEP-I/T/09-16 |
10.12.2022 |
2022_SPDC_199147_1 |
Baglihar HEP Stage I |
Electromechanical work |
Chanderkote Ramban |
2.56 lacs |
45 days |
E-NIT
|
E-NIT for "Supply of Siemens make Voltage Transformer Circuit Breakers for the PT,s of 150MW synchronous Generator of Power house BHEP-I Chanderkote Ramban, UT of J&K". |
GD/BHEP-I/T/01-08 |
10.12.2022 |
2022_SPDC_199148_1 |
Baglihar HEP Stage I |
Electrical Supply |
Chanderkote Ramban |
3.28 lacs |
120 days |
E-NIT
|
E-NIT for "Procurement of Consultancy for Detailed Design Review". |
JKPDC/Mohura HEP/PMC/8357 |
09.12.2022 |
2022_SPDC_198426_1 |
MOHURA HEP |
PMC |
MOHURA BARAMULLA |
|
42 Months |
1.Bid Invitation
2.Consultancy Tender
|
Budgetary Offer " Spares of CHEP-I"
|
GEN/PDC/U/1394-97 |
07.12.2022 |
2022_SPDC_198597_1 |
CHEP-I |
O&M works |
Laddan (Udhampur) |
|
|
Budgetary Offer |
E-Nit for " Supply of various testing equipments"
|
GDS/ 05 of 2022-23 |
05.12.2022 |
2022_SPDC_198597_1 |
2 X1 1.3 MW, USHP-1st |
Supply |
Sumbal, Kangan |
Rs.6.00 Lacs |
30 days |
E-NIT |
E-Nit for " Supply of automation spares for PLC of BHEP stage 1"
|
Bid Number: GEM/2022/B/2813471 |
05.12.2022 |
GEM/2022/B/2813471 |
Baglihar HEP Stage I |
Electrical work/IT |
Chanderkote Ramban |
Rs. 80,00,000 /- |
180 days |
E-NIT |
E-Nit for "Two year rate contract for repair/maintenance/fitment of sanitary items and other items of civil nature at JKPDC Corporate Office Srinagar"
|
E-NIT NO: 03 of 2022-23 |
01.12.2022 |
2022_SPDC_198092_1 |
CORPORATE ASSET MANAGEMENT |
CIVIL WORKS |
JKPDC CORPORATE OFFICE EXHIBITION GROUNDS SRINAGAR |
1.20 lacs |
Two Year Rate Contract |
E-NIT |
E-Nit for "Engineering, Manufacturing , Supply , Installation, Testing and commissioning of New Runnner for 35 MW Unit-I of USHP-II Kangan as per OEM drawing.
Repair and refurbishment of existing runner as per scope.General overhauling of MIV of Unit-I including its installation, testing and commissioning as per scope."
|
SEG/II/PDC/Tech/823-25 |
28.11.2022 |
2022_SPDC_197499_1 |
USHP-II Kangan |
Mechanical (Manufacturing) |
Power House Ganderbal |
1.20 lacs |
30 Days |
E-NIT |
E-Nit for "Engineering, Manufacturing , Supply , Installation, Testing and commissioning of New Runnner for 35 MW Unit-I of USHP-II Kangan as per OEM drawing.
Repair and refurbishment of existing runner as per scope.General overhauling of MIV of Unit-I including its installation, testing and commissioning as per scope."
|
SEG/II/PDC/Tech/823-25 |
28.11.2022 |
2022_SPDC_197499_1 |
USHP-II Kangan |
Mechanical (Manufacturing) |
Power House Ganderbal |
1.20 lacs |
30 Days |
E-NIT |
E-Nit for "Supply, Installation of guage meters at RD 40000, Headworks, Forebay and PHE Level of power house Ganderbal.".
|
GDG/T/40-49 |
26.11.2022 |
2022_SPDC_197499_1 |
Generation Division, Ganderbal |
Electric work |
Power House Ganderbal |
1.20 lacs |
30 Days |
E-NIT |
E-Nit for "Extension of Supply, Installation, Testing and Commissioning of CC TV cameras from Power House Ganderbal to Forebay and RD 40000.".
|
GDG/30-39 |
26.11.2022 |
2022_SPDC_197498_1 |
Generation Division, Ganderbal |
Electric work |
Power House Ganderbal |
1.50 lacs |
30 Days |
E-NIT |
E-Nit for "Repairing of Silt gate at Head works Preng of power house Ganderbal".
|
GDG/T/20-29 |
26.11.2022 |
2022_SPDC_197497_1 |
Generation Division, Ganderbal |
Civil work |
Power House Ganderbal |
1.49 lacs |
30 Days |
E-NIT |
E-Nit for "Repairing of Irrigation gate at RD 20000 and RD 23000 of power house Ganderbal.".
|
GDG/T/10-19 |
26.11.2022 |
2022_SPDC_197495_1 |
Generation Division, Ganderbal |
Civil work |
Power House Ganderbal |
1.50 lacs |
30 Days |
E-NIT |
E-Nit for "Repairing of PHE/Irrigation gate along with spill way channel at Forebay of power house Ganderbal".
|
GDG/T/01-09 |
26.11.2022 |
2022_SPDC_197492_1 |
Generation Division, Ganderbal |
Civil work |
Power House Ganderbal |
2.00 lacs |
30 Days |
E-NIT |
E-Nit for "Repair/restoration of damaged leg A foundation of tower location no. 9 of 400 KV D/C Baglihar Kishanpur transmission line.".
|
No. 10 of 2022-23 |
25.11.2022 |
2022_SPDC_197229_1 |
BHEP |
Civil work |
Dhalwas |
70.78784 Lacs |
90 Days |
E-NIT |
Corrigendum of "HIRING OF CHARTERED ACCOUNTANT FIRM FOR ERP ACCOUNTING SUPPORT FOR THE FINANCIAL YEARS (2022-23) and (2023-24)"
|
ENIT NO CA-01 |
25.11.2022 |
2022_SPDC_193203_1 |
CORPORATE OFFICE |
FINANCE |
Jammu and Kashmir |
|
365 Days |
Corrigendum |
Ext Notice for "Supply of Bagati Dry Firewood duly chopped to Bukhari size including carriages upto sites as directed by Divisional Office including weighting, loading/unloading etc complete Job". |
GD/LJHP/1186-94 |
24.11.2022 |
2022_SPDC_196410_1 |
LJHP |
Civil |
LJHP Power house Chahla |
0.60 lacs |
10 Days from the date of issue of LOA |
Ext. |
Budgetary Offers for "Repair of 110KW/150HP Aqua make Submersible Slurry pump set Drainage and Dewatering system of power house BHEP-I Chanderkote". |
GD/BHEP-I/930-32 |
23.11.2022 |
|
Baglihar HEP Stage I |
Electromechanical work |
Chanderkote Ramban |
|
|
Offer |
EOI for "• Supply, testing and commissioning OF Portable Dissolved Gas Analyser , Trend Analysis of Historical Data, Alerts mapping as per End User practice standards, Ratio Analyser, Roger’s Ratio, Duval Triangle OF A REPUTED MAKE.
• HAVING CAPABILTIY of Detection gases OF Hydrogen H2, Carbon Monoxide CO, Acetylene C2H2 , Ethylene C2H4 , Methane CH4 , Ethane C2H6 , Propane C3H8 , Carbon Dioxide CO2 , Oxygen O2 , Nitrogen N2 , Oil moisture analysis H2O and also Moisture analysis as well as Ability to test gas sample from Buchholz Relays."
|
EOI/04 of 2022 |
22.11.2022 |
|
Baglihar HEP Stage-II |
Electrical Equipment supply Work |
BHEP-II Power house ,Chanderkote Ramban |
|
|
EOI |
Quotations for "Different works of CHEP-I, II & III" |
GEN/PDC/U/1307-10 |
22.11.2022 |
|
CHEP-I, II & III |
O&M works |
Laddan & Dibber (Udhampur) |
|
|
Quotation |
EOI for "SITC of Transformer oil Filtration Plan" |
03 of 2021 |
21.11.2022 |
Baglihar HEP Stage II |
2 X1 1.3 MW, USHP-1st |
ELECTRICAL SUPPLY |
Chanderkote Ramban |
|
|
EOI |
E-NIT for "Supply of dry baghati firewood" |
GDS/ 02 of 2022-23 |
21.11.2022 |
|
2 X1 1.3 MW, USHP-1st |
Supply |
Sumbal, Kangan |
0.70 Lacs |
07 Days |
NIT |
NIT for "Replacement of power cables of 130 HP Submersible Dewatering Pump No. 1 installed inside the Dewatering Sump of Dam Gallery at BHEP, Chanderkote" |
05 of 2022-23 |
18.11.2022 |
2022_SPDC_196605_1 |
BHEP |
Pump/Motors) Electro-Mechanical |
Chanderkote. |
8,35,000.00 |
30 Days |
E-NIT |
GIST E-NIT of "HIRING OF CHARTERED ACCOUNTANT FIRM FOR ERP ACCOUNTING SUPPORT FOR THE FINANCIAL YEARS (2022-23) and (2023-24)"
|
ENIT NO CA-01 |
20.10.2022 |
2022_SPDC_193203_1 |
CORPORATE OFFICE |
FINANCE |
Jammu and Kashmir |
|
365 Days |
Corrigendum-I |
NIT for "Survey, Design, Detailed Engineering and Cost evaluation/estimation for Supply, Installation,Testing and Commissioning of Trash Rake Cleaning Machine (TRCM) at Lower Jhelum Hydroelectric Project (LJHP), Gantamulla, Baramulla." |
GD/LJHP/Tech/75-84 |
16.11.2022 |
2022_SPDC_193661_1 |
LJHP |
Civil |
LJHP Power house Chahla. |
14.00 Lacs |
60 |
Extension |
NIT for "• Testing of all 6 sections of 400 kV,EHV, XLPE interconnecting cable systems between Bus 1A-2A of power house BHEP-I and Bus 1B-2B of power house BHEP-II.
• In addition to this the 400 KV damaged bus coupler located at GIS BHEP stage II is also required to be assessed for quantum of damages for its subsequent rectification afterwards." |
EOI/02 of 2022 |
16.11.2022 |
Baglihar HEP Stage II |
LJHP |
Electrical |
BHEP-II Power house ,ChanderkoteRamban |
|
|
EOI |
NIT for "Survey, Design, Detailed Engineering and Cost evaluation/estimation for Supply, Installation, Testing and Commissioning of Trash Rake Cleaning Machine (TRCM) at Lower Jhelum Hydroelectric Project (LJHP), Gantamulla, Baramulla." |
GD/LJHP/Tech/75-84 |
16.11.2022 |
2022_SPDC_193661_1 |
LJHP |
Civil |
LJHP Power house Chahla. |
14.00 Lacs |
60 |
Extension |
Cancellation for "supply of 150 quintals (One Hundred Fifty Quintals) for dry Bagati firewood duly chopped to the stove size for the winter season of 2022-23". |
GD/LJHP/1018-22 |
15.11.2022 |
|
LJHP |
Civil |
LJHP Power house Chahla. |
|
05 Days from the date of issue of LOA |
Cancellation |
E-NIT for "Annual Preventive Maintenance and Testing / Idling of Drilling Rig DR3, DR6, DR8 and DR11". |
:06 of 2022-23 |
10.11.2022 |
2022_SPDC_195438 |
NIL |
Mechanical maintenance |
Kangan, Ganderbal |
1.45 lacs |
10 days |
NIT |
E-NIT for "Repairs to 2 No. Rolling Shutters of NLP Stores at Baramulla". |
:05 of 2022-23 |
09.11.2022 |
2 022_SPDC_195338 |
NIL |
Mechanical maintenance |
NLP Sub-Division Baramulla |
0.30 lacs |
05 days |
NIT |
E-NIT for "Upgradation/Restoration of Lighting system of power house BHEP-I". |
: GEM/2022/B/2716777 |
09.11.2022 |
GEM/2022/B/2716777 |
Baglihar HEP Stage I |
Electrical work |
Chanderkote Ramban |
Rs. 29,88,875/- with all the taxes and duties /- |
30 days |
NIT |
E-NIT for "Restoration/augmentation of Various Instrumentation works of BHEP stage-I". |
: GEM/2022/B/2712468 |
07.11.2022 |
GEM/2022/B/2712468 |
Baglihar HEP Stage I |
Electrical work |
Chanderkote Ramban |
Rs. 8,62,580 /- |
90 days |
NIT |
E-NIT for "Annual Preventive Maintenance of 05 Ton Colles Crane including fuel for Testing / Idling." |
04 of 2022-23 |
07.11.2022 |
2022_SPDC_195142_1 |
NIL |
Mechanical maintenance |
NLP Sub-Division Baramulla |
Rs. 0.47 lacs |
05 days |
NIT |
E-NIT for "Upgradation of Both the 35x150MT, EOT Cranes of Power house BHEP-I". |
GEM/2022/B/2711016 |
05.11.2022 |
GEM/2022/B/2711016 |
Baglihar HEP Stage I |
Electro Mechanical work |
Chanderkote Ramban |
Rs. 14,30,122.00/- |
45 days |
NIT |
E-NIT for "Annual Preventive Maintenance of 40 Ton Voltas Crane including fuel for Testing / Idling". |
. 03 of 2022-23 |
03.11.2022 |
2022_SPDC_194653 |
NIL |
Repair and maintenance |
NLP Sub-Division Baramulla |
1.36 lacs |
15 days |
NIT |
EIO for "TECHNO- COMMERCIAL OFFER FOR REPLACEMENT OF OBSOLETE 12 NO. PLCC PANELS (06 NO. AT EACH CIRCUIT FOR BOTH ENDS OF
400 KV D/C BAGLIHAR KISHANPUR TRANSMISSION LINE INCLUDING REPLACEMENT OF 4 NO. OF OLD DISTANCE RELAYS (02 NOS FOR EACH CIRCUIT)."
|
. 05 of 2022-23 |
03.11.2022 |
2022_SPDC_193993_1 |
BHEP, CHANDERKOTE |
Electrical |
Baglihar, Chanderkote. |
10.00 lacs |
11 days |
NIO |
EIO for "TECHNO-COMMERCIAL OFFER FOR INTEGRATION OF DATA OF 06 NO. BAYS OF BHEP-I WITH NRLDC PORTAL AT BAGLIHAR HYDRO ELECTRIC PROJECT STAGE-I, CHANDERKOTE"
|
. 04 of 2022-23 |
03.11.2022 |
2022_SPDC_193989_1 |
BHEP, CHANDERKOTE |
Electrical |
Baglihar, Chanderkote. |
10.00 lacs |
11 days |
NIO |
EIO for "TECHNO-COMMERCIAL OFFER FOR INTEGRATION OF DATA OF 06 NO. BAYS OF BHEP-I WITH NRLDC PORTAL AT BAGLIHAR HYDRO ELECTRIC PROJECT STAGE-I, CHANDERKOTE"
|
. 03 of 2022-23 |
03.11.2022 |
2022_SPDC_193980 |
BHEP, CHANDERKOTE |
Electrical |
Baglihar, Chanderkote. |
10.00 lacs |
11 days |
NIO |
E-NIT for " Annual Maintenance contract for Unforeseen restoration of Civil works like Protection walls ,Crate Revetment, Masonry Drains
Etc arising from time to time on emergent basis." |
TLD/ BHEP/NIT/ 09 |
02.11.2022 |
2022_SPDC_194444 |
BHEP, CHANDERKOTE |
Civil |
Baglihar to Kishanpur |
10.00 lacs |
365 days |
E-NIT |
E-NIT for " Physical verification of divisional store including shifting of material dumped in the ODY including stocking of same at safer place" |
TLD/ BHEP/NIT/ 08 |
02.11.2022 |
2022_SPDC_194432 |
BHEP, CHANDERKOTE |
Electrical |
Kawa Udhampur |
0.50 lacs |
30 days |
E-NIT |
E-NIT for " Repairs to 40 Ton Voltas Crane of NLP Sub-Division Baramulla" |
O2 of 2022-23 |
02.11.2022 |
2022_SPDC_194468_1 |
Nil |
Mechanical repair |
NLP Sub-Division Baramulla |
1.39 lacs |
15 days |
E-NIT |
Budgetary Offer for Part-A: Inspection/Testing of under wtare parts of Machine-I & Machine-II of LJHP.
Part-B: Inspection and checking of bearing clearances and checking of alignment of Machine-I & Machine-II of LJHP |
GD/LJHP/1018-22 |
29.10.2022 |
|
LJHP |
Electrical |
LJHP Power house Chahla |
|
|
Budgetary Offer |
E-NIT for " Raising of Water Tank in MS Structure with fixing of CGI sheets (to be provided by Department)
and concrete flooring of temporary washroom for watch and ward staff for Service Station including painting of entrance gate at Bemina" |
NIT-01 |
29.10.2022 |
2022_SPDC_193768 |
Nil |
Civil |
Office of the Executive Engineer,MID, PDC Complex Bemina |
1.31 lacs |
30 days |
E-NIT |
Survey, Design, Detailed Engineering and Cost evaluation/estimation for Supply, Installation, Testing and Commissioning of Trash Rake Cleaning Machine (TRCM) at Lower Jhelum Hydroelectric Project (LJHP), Gantamulla, Baramulla |
GD/LJHP/Tech/75-84 |
25.10.2022 |
2022_SPDC_193661_1 |
LJHP |
Civil |
LJHP Power House |
14.00 Lacs |
60 days |
E-NIT |
EOI for "R&M of old/damaged LED lights at dam of BHEP" |
04 of 2022 |
25.10.2022 |
2022_SPDC_192097_1 |
BHEP |
Mechanical |
BHEP Chanderkote |
Rs. 3,50,000.00/- |
30 days |
EOI |
Quotation of "S
upply of 150 quintals (One Hundred Fifty Quintals) for dry Bagati firewood duly chopped to the stove size for the winter season of 2022-23" |
GD/LJHP/1018-22 |
25.10.2022 |
|
LJHP |
Civil |
LJHP Power house Chahla. |
|
05 Days from the date of issue of LOA |
Quotation |
Budgetary Offer for "Spares for CHEP-III" |
JGEN/PDC/U/1189-91 |
25.10.2022 |
|
CHEP-III |
O&M works |
Dibber (Udhampur) |
|
|
Budgetary Offer |
NIT of "Appointment of Cost Accounting firm for preparation of Cost Accounting records of JKSPDCL for Financial years-2019-20,2020-21 and 2021-22" |
JKPDC/Fin/7190-93 |
21.10.2022 |
GEM/2022/B/2667909 |
Cost Accounting Records of JKSPDCL |
Financial services |
Corporate office JKSPDCL, Srinagar/Jammu |
|
08 months from the date of LOA |
NIT |
Quotation of "Request for budgetary offer for the procurement of Steel Wire rope" |
MECH/BHEP/1017-19 |
20.10.2022 |
|
BHEP |
Mechanical |
Mechanical Divisional Store BHEP Chanderkote |
2.50 Lac |
05 days |
Quotation |
Short term E-NIT of "Repairing/Arresting leakage of penstock of Unit-Ist ascertaining its vibration, realignment of penstock and allied works of 3x35MW LJHP Power House"
|
GD/LJHP/Tech/65-74 |
21.10.2022 |
2022_SPDC_193226_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
3.48 Lacs |
15 Days |
Short Term E-NIT |
GIST E-NIT of "HIRING OF CHARTERED ACCOUNTANT FIRM FOR ERP ACCOUNTING SUPPORT FOR THE FINANCIAL YEARS (2022-23) and (2023-24)"
|
ENIT NO CA-01 |
20.10.2022 |
2022_SPDC_193203_1 |
CORPORATE OFFICE |
FINANCE |
Jammu and Kashmir |
|
365 Days |
GIST E-NIT |
NIT of "Clearance of Slips ,Bushes , Vegetation and Removal of Berms, Boulders throughout the whole length of Wangath Link canal USHP-I"
|
CMD/USHP-II/05 of 2022 |
18.10.2022 |
2022_spdc_192890_1 |
CMD USHP-II KANGAN |
Civil Works |
Wangath Kangan |
500000.00 |
365 Days |
NIT |
Cancellation Notic no.2 of "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV,
Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus ,
including Supply of mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House,
Baramulla, JKSPDC"
|
GD/LJHP/Tech/36-46 Dt:- 03-08-2022 |
18.10.2022 |
2022_SPDC_182431_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
1639.00 Lacs |
365 Days |
Cancellation Notice no.2 |
NIO of "Capital Overhauling of Gates and Gearings alongwith allied system"
|
USHP-II/GD/Tech/177-78 |
15.10.2022 |
|
USHP-II Kangan |
Electro-mechanical, Hydro-mechanical |
Gate sites |
|
65 Days |
NIO |
NIO of "Refurbishment of runner alongwith other allied works as per scope"
|
USHP-II/GD/Tech/175-76 |
13.10.2022 |
|
USHP-II Kangan |
Electro-mechanical |
Power house |
|
30 Days |
NIO |
E-NIT of "Different Works of CHEP-II and III"
|
GEN/PDC/U/1028-33 dt. 11.10.2022 and 1132-37 |
13.10.2022 |
2022_SPDC_191691_1
2022_SPDC_191723_1
2022_SPDC_191739_1
2022_SPDC_191743_1
2022_SPDC_191748_1
2022_SPDC_191901_1
2022_SPDC_191936_1
|
CHEP-II and III |
O and M works |
Laddan and Dibber (Udhampur) |
|
|
E-NIT |
E-NIT GIST of "Repair of two number Shutter Gates of Divisional Store"
|
01 of 2022 |
12.10.2022 |
2022_SPDC_189439_2 |
BHEP |
Mechanical |
Chanderkote Ramban |
Rs 66,713.00 |
10 Days |
E-NIT GIST |
NIT for "Different Works of CHEP-I"
|
GEN/PDC/U/1115-20 |
10.10.2022 |
2022_SPDC_191388_1
2022_SPDC_191418_1
2022_SPDC_189943_1
2022_SPDC_191367_1
|
CHEP-I |
O and M works |
Laddan (Udhampur) |
|
|
E-NIT |
"Budgetary Offer Budgetary Offers for Supply of spares for Generator Transformer Marshalling Box, Unit and Main distribution board of power house BHEP-I"
|
GD/BHEP-I/719-21 |
08.10.2022 |
|
Baglihar HEP Stage I |
Electrical work |
Chanderkote Ramban |
|
|
Budgetary Offer |
"Budgetary Offers for Maintenance and calibration of SF6 Gass Analyzer, Maintenance of SF6 Gass Handling Unit and SF6 Gass Leakage Detector of power house BHEP-I"
|
GD/BHEP-I/722-24 |
08.10.2022 |
|
Baglihar HEP Stage I |
Electrical work |
Chanderkote Ramban |
|
|
Budgetary Offers |
Corrigendum for "Permanent restoration of OLC from RD 5840 M to Aqua-duct RD 5990 of Wangath Link canal USHP-II"
|
CMD/USHP-II/03 of 2022 |
07.10.2022 |
2022_spdc_189793_1 |
CMD USHP-II KANGAN |
Civil Work |
Wangath Kangan |
Rs 50,00,000.00 |
30 days |
Corrigendum |
NIO for "1. Engine Head Servicing along with Piston Check.
2. Coolant Refil.
3. M-Oil Change.
4. Wheel Alignment and Balancing.
5. Complete Servicing." |
SEG/II/PDC/Tech/01 |
01.10.2022 |
|
Generation Circle-II Bemina |
Mechanical. |
Srinagar |
Sought |
07 days |
NIO |
NIT for "Repair and renovation of divisional office at Kupwara.".
|
CC/PDC/K/e-NIT/02 of 2022-23 |
29.09.2022 |
2022_SPDC_190489_1 |
12 MW Karnah HEP(PMDP). |
Civil. |
Kupwara |
4.50 Lacs |
45 days |
NIT |
NIT for "Detailed Estimate for the construction of compound wall (Front Side) of Divisional office".
|
CC/PDC/K/e-NIT/02 of 2022-23 |
29.09.2022 |
2022_SPDC_190473_1 |
12 MW Karnah HEP(PMDP). |
Civil. |
Kupwara |
5.44 Lacs |
30 days |
NIT |
NIT for "Providing of Security Guards (Armed and Un-armed) for watch and ward of Corporate Office JKPDC at Ashok Nagar Satwari, Jammu".
|
E-NIT No. 05 of 2022-23 |
29.09.2022 |
2022_SPDC_190397_1 |
Estates Special Sub Division JKPDC Jammu. |
Supply of Man Power. |
Satwari Jammu |
Rs. 3.08 Lacs |
As and When Required |
NIT |
NIT for "Servicing and Maintenance of 3 Nos 62.5 KVA DG Sets of Sudhir Gen Set with Cummins engines and 2 Nos 25 KVA DG
Sets of Sudhir Gen set with Cummins engines installed in the jurisdiction of Estates Special Sub Division JKPDC Corporate Office, Satwari, Jammu".
|
E-NIT No. 04 of 2022-23 |
29.09.2022 |
2022_SPDC_189037_1 |
Estates Special Sub Division JKPDC Jammu. |
Servicing and Maintenance. |
Satwari, Janipur & Bhatindi, Jammu |
Rs. 0.968 Lacs |
20 days from date of allotment |
NIT |
Corrigendum for "Clearance of Slips ,Bushes , Vegetation and Removal of Berms, Boulders throughout the whole length of Wangath Link canal USHP-II"
|
CMD/USHP-II/02 of 2022 |
27.09.2022 |
2022_SPDC_190015_1 |
CMD USHP-II KANGAN |
Civil Works. |
Wangath Kangan |
Rs.5,00,000.00 |
365 Days |
Corrigendum |
Cancellation for “Painting and Re- lettering of sign boards depicting information regarding NGHEP Ganderbal at various spot"
|
NIT vide No. 01 of 2016-17 |
27.09.2022 |
2016_SPDC_33939_13 |
NGHEP. |
CIVIL. |
GANDERBAL. |
Rs 1.01 LACS (ADVERTISED COST). |
10 DAYS. |
Cancellation |
Budgetary Offer for "Different Works of CHEP-II"
|
GEN/PDC/U/1052-55 |
26.09.2022 |
|
CHEP-II |
O&M works |
Laddan (Udhampur) |
|
|
Budgetary Offer |
NIT for "Restoration of Escape channel at RD 12125 M of Sumbal Link Canal of USHP-II Kangan at Satrina."
|
E-NIT NO.04 of 2022 |
26.09.2022 |
2022_SPDC_190015_1 |
CMD USHP-II KANGAN |
Civil Works. |
Sumbal link canal Satrina Kangan |
Rs. 2,10,00,000.00 |
90 days |
NIT |
NIT for "Permanent restoration of OLC from RD 5840 M to Aqua-duct RD 5990 of Wangath Link canal USHP-II
|
CMD/USHP-II/03 of 2022 |
24.09.2022 |
2022_spdc_189793_1 |
CMD USHP-II KANGAN |
Civil Work |
Wangath Kangan |
Rs 50,00,000.00 |
30 days |
NIT |
NIT for "Restoration of both the Omega make elevators of BHEP -II"
|
E-NIT no. 2 |
22.09.2022 |
|
BHEP |
Mechanical |
BHEP-II |
|
30 days |
NIT |
NIT for "Repair of 2 no shutters of Divisiona stores."
|
NIT no.1 |
22.09.2022 |
|
BHEP |
Mechanical |
Mechanical Divisional store |
|
10 days |
NIT |
Extension for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of
mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKSPDC".
|
GD/LJHP/Tech/36-46 |
20.09.2022 |
2022_SPDC_182431_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
1639.00 Lacs |
365 Days |
NIT |
NIO for "Carrying out Pending works related to Complete Overhauling and Re-alignment of Unit II (1×1.5 MW) at MHEP Pahalgam".
|
GTD/PDC/TS/179–82 |
20.09.2022 |
|
MHEP Pahalgam |
Electrical and Mechanical |
Pahalgam Powerhouse |
|
07 Days |
NIT |
NIT Repairing to damaged Electric fitting of Divisional office, Bemina Srinagar
|
03 of 2022-23 |
19.09.2022 |
|
|
Electrical. |
Bemina |
Rs. Rs 1.00 Lakh |
20 Days |
NIT |
NIT forUpgradration of Sub- Divisional office Pahalgam.
|
02 of 2022-23 |
19.09.2022 |
|
|
Civil. |
Bemina/ Anantnag |
Rs. 0.97 Lakhs |
20 Days |
NIT |
NIT for Construction of washroom and upgradration of SubDivisional Office Anantnag.
|
02 of 2022-23 |
19.09.2022 |
|
|
Civil. |
Bemina/ Anantnag |
Rs. 1.00 lakh |
20 Days |
NIT |
NIT for "Construction of new parking lot in CE CI&D Premise" |
02 of 2022-23 |
19.09.2022 |
|
|
Civil. |
Bemina/ Anantnag |
1.58 Lakhs |
20 Days |
NIT |
NIT for "Development of Lawn and fencing of Chitterkote Guest House".
|
CC/PDC/K/e-NIT/01 of 2022-23 |
19.09.2022 |
2022_SPDC_188912_1 |
02 MW Karnah HEP & 12 MW Karnah HEP(PMDP) |
Civil. |
Karnah; District: Kupwara |
1.30 Lacs |
20 Days |
NIT |
Nit for "Extension of Dak Bungalow at Baghbella by way of construction of two additional rooms and washroom".
|
CC/PDC/K/e-NIT/01 of 2022-23 |
19.09.2022 |
2022_SPDC_188868_1 |
02 MW Karnah HEP & 12 MW Karnah HEP(PMDP) |
Civil. |
Karnah; District: Kupwara |
23.92 Lacs |
60 Days |
NIT |
NIT for "Periodic Desilting- Clearance of Trench weir/ Water Conductor/Desilting Chamber & Forebay/ repairs to existing trash rack and laying of crates for diversion bund/Protection wherever required. (Stage Contract)"
|
CC/PDC/K/e-NIT/01 of 2022-23 |
19.09.2022 |
2022_SPDC_188857_1 |
02 MW Karnah HEP & 12 MW Karnah HEP(PMDP) |
Civil. |
Karnah; District: Kupwara |
6.00 Lacs |
Stage Contract (01 year) |
NIT |
Revised quotation call for SITC of Refrigerant air dryers along with auto flush drain valves for both the already installed compressor’s storage tank of power house BHEP-I.
|
GD/BHEP-I/618-20 |
17.09.2022 |
|
Baglihar HEP Stage I |
Electrical . |
Chanderkote Ramban |
|
|
Quotation |
Cancellation of E-NIT for "Repair s and renovation of sub divisional office at CCD-11, restoration of water supply to the divisional office and repairs to m ain
gate, development of lawn/paths at divisional office" . |
E-NIT 02 of 2022 |
15.09.2022 |
2022_SPDC_165380_1 |
New Ganderbal HEP |
Civil Works |
Preng Kangan and Ganderbal. |
RsRs.2.18 lakhs |
10 days |
Cancellation Notice |
Cancellation of NIT for "Renovation of AEEs/J.Es residential quarters by way of repairing of floors,ceilings,walls at Headworks Preng." |
E-NIT 01 of 2022 |
15.09.2022 |
2022_SPDC_165323_1 |
New Ganderbal HEP |
Civil Works |
Preng Kangan and Ganderbal. |
Rs4.08867 lakhs |
20 days |
Cancellation Notice |
Budgetary Offers for Jobs for 2022-23.
|
GDG/536-37 |
12.09.2022 |
|
15MW Ganderbal Hydro Electric Project |
Electrical . |
Ganderbal |
|
|
Budgetary Offer |
NIO for Design, Engineering, Manufacturing, Supply , Installation , Testing & Commissioning of
35MW Generator (Stator Complete and Rotor Poles) compatible with existing system along with necessary allied works/accessories
|
SEG/II/PDC/Tech/ 468-70 |
13.09.2022 |
|
USHP-II Kangan |
Electrical . |
Kangan |
|
10 Days |
NIO |
NIO for Different Works of CHEP-I
|
GEN/PDC/U/909-11 |
12.09.2022 |
|
CHEP-I & III |
Electrical . |
Laddan & Dibber (Udhampur) |
|
|
NIO |
NIO for Different Works of CHEP-III
|
GEN/PDC/U/912-14 |
12.09.2022 |
|
CHEP-I & III |
Electrical . |
Laddan & Dibber (Udhampur) |
|
|
NIO |
NIO for Design, Engineering, Manufacturing, Supply , Installation , Testing & Commissioning of
35MW Generator (Stator Complete and Rotor Poles) compatible with existing system along with necessary allied works/accessories
|
SEG/II/PDC/Tech/ 468-70 |
13.09.2022 |
|
USHP-II Kangan |
Electrical . |
Kangan |
|
10 Days |
Corrigendum |
Corrigendum for "Providing RCC pipe culvert at RD 18000ft of Safe passage of chute discharge of USHP-I Sumbal"
|
CMD/SVP/K/ 02 of 2022 |
08.09.2022 |
2022_SPDC_185946_3 |
CMD SVP Kangan (USHP-I Sumbal) |
Civil . |
USHP-I Sumbal |
Rs26000.00/- |
05 Days |
Corrigendum |
Corrigendum for "Clearance of catch water drain at RD 31000ft of USHP-I Sumbal"
|
CMD/SVP/K/ 02 of 2022 |
08.09.2022 |
2022_SPDC_185946_2 |
CMD SVP Kangan (USHP-I Sumbal) |
Civil . |
USHP-I Sumbal. |
Rs1,50,000.00/- |
25 Days |
Corrigendum |
Corrigendum for "Emergency unforeseen works of HEP old Ganderbal caused due to natural calamities and other causes etc Stage contract 2022-23"
|
CMD/SVP/K/ 02 of 2022 |
08-09-2022 |
2022_SPDC_185946_1 |
CMD SVP Kangan (Old Ganderbal) |
Civil . |
Old Ganderbal. |
Rs.12,00,000.00 |
360 Days |
Corrigendum |
NIO for "Cost of various materials for supply of material for repair and restoration for grid and allied lines of BHEP Chanderkote".
|
EPD/BHEP/211-12 |
08-09-2022 |
2022_SPDC_186875_1 |
Baglihar HEP |
Electrical Work . |
BHEP-II Power house ,Chanderkote Ramban |
|
|
NIO
|
Corrigendum for"Clearance of slips, Bushes, Vegetation and Removal of Berms, Boulders throughout the whole length of Wangath link canal USHP-II"
|
CMD/USHP-II/ 856-69 |
08-09-2022 |
|
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
5,00,000.00 |
365 Days |
Corrigendum
|
Corrigendum for"Permanent restoration of OLC from RD 5840 M to Aqua-duct RD 5990 of Wangath Link canal USHP-II"
|
CMD/USHP-II/ 870-83 |
08-09-2022 |
2022_SPDC_185963_2 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs.50,00,000.00 |
30 Days |
Corrigendum
|
Corrigendum for"Permanent restoration of Damaged panels at spots from RD 277 to RD 4600 M OF Wangath Link canal USHP-II"
|
CMD/USHP-II/ 870-83 |
08-09-2022 |
2022_SPDC_185963_1 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs.1,45,00,000.00 |
80Days |
Corrigendum
|
NIO for Different Works of Bhaderwah HEP
|
GEN/PDC/U/875-77 |
07.09.2022 |
|
Bhaderwah HEP |
O&M works |
Sarthingal |
|
|
NIO |
Providing and fixing of Gypsum Board False Ceiling including Painting of Room No. 1 & Room No.2 VIP Suite Field Hostel at JKSPDC Corporate Office Satwari Jammu.
|
E-NIT No. 03 of 2022-23 |
06-09-2022 |
2022_SPDC_186875_1 |
Estates Special Sub Division JKPDC Jammu |
Civil . |
Jammu |
Rs. 0.76 Lacs |
20 days from date of allotment |
NIT
SBD
|
Providing and fixing of Gypsum Board False Ceiling including Painting of Room No. 1 & Room No.2 VIP Suite Field Hostel at JKSPDC Corporate Office Satwari Jammu.
|
E-NIT No. 03 of 2022-23 |
06-09-2022 |
2022_SPDC_186875_1 |
Estates Special Sub Division JKPDC Jammu |
Civil . |
Jammu |
Rs. 0.76 Lacs |
20 days from date of allotment |
NIT
SBD
|
Corrigendum for "Permanent restoration of OLC from RD 5840 M to Aqua-duct RD 5990 of Wangath Link canal USHP-II"
|
CMD/USHP-II/01 of 2022 |
29.08.2022 |
2022_SPDC_185946_3 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs50,00,000.00/- |
30 Days |
Corrigendum |
Corrigendum for " Permanent restoration of Damaged panels at spots from RD 277 to RD 4600 M OF Wangath Link canal USHP-II"
|
CMD/USHP-II/01 of 2022 |
29.08.2022 |
2022_SPDC_185963_2 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs1,45,00,000.00/- |
80 Days |
Corrigendum |
CORRIGENDUM for "Emergency unforeseen works of HEP old Ganderbal caused due to natural calamities and other causes etc (Stage contract 2022-23)"
|
CMD/SVP/K/ 02 of 2022 |
29.08.2022 |
2022_SPDC_185946_1 |
CMD SVP Kangan |
Civil . |
Old Ganderbal |
Rs12,00,000.00 |
365 Days |
CORRIGENDUM |
NIT for "Permanent restoration of OLC from RD 5840 M to Aqua-duct RD 5990 of Wangath Link canal USHP-II"
|
CMD/USHP-II/01 of 2022 |
29.08.2022 |
2022_SPDC_185946_3 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs50,00,000.00/- |
30 Days |
NIT |
NIT for " Permanent restoration of Damaged panels at spots from RD 277 to RD 4600 M OF Wangath Link canal USHP-II"
|
CMD/USHP-II/01 of 2022 |
29.08.2022 |
2022_SPDC_185963_2 |
CMD USHP-II KANGAN |
Civil . |
Wangath Kangan |
Rs1,45,00,000.00/- |
80 Days |
NIT |
NIT for "Providing RCC pipe culvert at RD 18000ft of Safe passage of chute discharge of USHP-I Sumbal"
|
CMD/SVP/K/ 02 of 2022 |
29.08.2022 |
2022_SPDC_185946_3 |
CMD SVP Kangan (USHP-I Sumbal) |
Civil . |
USHP-I Sumbal |
Rs26000.00/- |
05 Days |
NIT |
NIT for "Clearance of catch water drain at RD 31000ft of USHP-I Sumbal"
|
CMD/SVP/K/ 02 of 2022 |
29.08.2022 |
2022_SPDC_185946_2 |
CMD SVP Kangan (USHP-I Sumbal) |
Civil . |
USHP-I Sumbal. |
Rs1,50,000.00/- |
25 Days |
NIT |
NIT for "Emergency unforeseen works of HEP old Ganderbal caused due to natural calamities and other causes etc ( Stage contract 2022-23)"
|
CMD/SVP/K/ 02 of 2022 |
29.08.2022 |
2022_SPDC_185946_1 |
CMD SVP Kangan (Old Ganderbal) |
Civil . |
Old Ganderbal. |
Rs.12,00,000.00 |
360 Days |
NIT |
Budgetary Offer for "Offer for Supply of Pneumatic and mechanical torque wrenches along with allied accessories for power house of BHEP-I, Chnaderkote." |
GD/BHEP-I/545-47 |
26.08.2022 |
|
Baglihar HEP Stage I |
Mechanical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Budgetary Offer for "Offer for Supply of Pneumatic and mechanical torque wrenches along with allied accessories for power house of BHEP-I, Chnaderkote." |
GD/BHEP-I/545-47 |
26.08.2022 |
|
Baglihar HEP Stage I |
Mechanical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Budgetary Offer for "Offer for Supply of Alfa Laval make Separator model MAB 103B-24 for existing hydraulic oil filtration machine of Power house BHEP-I Chanderkote." |
GD/BHEP-I/542-44 |
26.08.2022 |
|
Baglihar HEP Stage I |
Mechanical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Budgetary Offer for "Offer for Overhauling of Farmtrac 70, 4x4 Tractor available inside the Power house of BHEP-I Chanderkote" |
GD/BHEP-I/530-41 |
26.08.2022 |
|
Baglihar HEP Stage I |
Mechanical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Budgetary Offer for "Offer for Hiring of vehicle for O&M staff of Power house of BHEP-I Chanderkote" |
GD/BHEP-I/530-41 |
26.08.2022 |
|
Baglihar HEP Stage I |
Mechanical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Budgetary Offer for "Offer for SITC of Refrigerant air dryers along with auto flush drain valves for both the already installed compressor’s storage tank of power house BHEP-I." |
GD/BHEP-I/530-41 |
26.08.2022 |
|
Bagli har HEP Stage I |
Electrical. |
Chanderkote Ramban. |
|
|
Budgetary Offer |
Corrigendum for "Survey, Design, Engineering, Procurement, Manufacturing, Supply, Erection, Testing And Commissioning of 132 KV Double Circuit Transmission Line For Evacuation Of Power From 37.5 MW Parnai HEP (Bhata Durian) To 132133 KV Draba Grid Station/ Switchyard and 02 No 132KV Line Bays
At The Receiving End i.e. 132/33 kV Draba Grid Station Distt. Poonch J&K Through Turnkey Mode". |
03 of 2022-23 |
10-08-2022 |
2022_SPDC_174394_1 |
37.5 MW Parnai HEP |
|
Bhata Durian, J&K |
|
24 Months |
Corrigendum |
EOI for "SITC of tie breaker scheme at 400 KV Pot Head Yard of 3 X 150 MW Baglihar Hydro Electric Project-11, Distt. Ramban, J&K UT GIS and (in case of Tender/NIT) so as to isolate 400 KV indoor
interconnection of 40OKV Feeder No. 384 i. e Baglihar- Kishenpur and Baglihar -New Wanpoo LILO circuit in Pot Head Yard including Extension of switch yard along with civil works .." |
EOI/01 of 2022 |
25.08.2022 |
|
Baglihar HEP Stage-IILJHP |
Electrical and Civil work |
BHEP-II Power house ,ChanderkoteRamban . |
|
|
EOI |
NIT for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares /
accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKSPDC." |
GD/LJHP/Tech/36-46 |
23.08.2022 |
2022_SPDC_182431_1 |
LJHPLJHP |
Electrical. |
LJHP Power house Chahla. |
1639.00 Lacs |
365 Days |
Extension |
Budgetary Offer"STIC of 300 sqmm single core cable for 380 kVA DGset " |
|
22.08.2022 |
2022_SPDC_184397_1 |
BHEPLJHP |
Mechanical |
BHEP DAM |
|
07 Days |
Offer |
NIT "Maintenance & procurement work of Estates Special Sub Division JKPDC at Corporate Office, Satwari, Jammu." |
E-NIT No. 02 of 2022-23 |
23.08.2022 |
2022_SPDC_184397_1 |
Estates Special Sub Division JKPDC JammuLJHP |
Civil |
Jammu |
Rs. 32.00 Lacs |
As and When Required (upto 1 year from date of allotment) |
NIT |
NIT "Providing of Security Guards (Armed and Un-armed) for watch and ward of Corporate Office JKPDC at Ashok Nagar Satwari, Jammu" |
E-NIT No. 01 of 2022-23 |
23.08.2022 |
2022_SPDC_184359_1 |
Estates Special Sub Division JKPDC JammuLJHP |
Supply of Man Power |
Satwari Jammu |
Rs. 3.08 Lacs |
As and When Required |
Corrigendum |
NIT "Providing of Security Guards (Armed and Un-armed) for watch and ward of Corporate Office JKPDC at Ashok Nagar Satwari, Jammu" |
E-NIT No. 01 of 2022-23 |
23.08.2022 |
2022_SPDC_184359_1 |
Estates Special Sub Division JKPDC JammuLJHP |
Supply of Man Power |
Satwari Jammu |
Rs. 3.08 Lacs |
As and When Required |
NIT |
Budgetary offers for conducting of CEC of the O&M and Capital Works for 2022-23. |
GD/LJHP/647 |
17.08.2022 |
|
LJHP |
|
LJHP |
|
07 Days |
Budgetary Offers |
NIO for "Various works" |
GDS/593-95 |
10.08.2022 |
|
2 X1 1.3 MW, USHP-1st |
Electrical. |
Sumbal, Kangan |
|
|
NIO |
NIO for "Updation of protection, control system" |
GDS/596-98 |
10.08.2022 |
|
2 X1 1.3 MW, USHP-1st |
Electrical. |
Sumbal, Kangan |
|
|
NIO |
NIO for "Supply of new bearing pads and rebabitating of existing ones as per scope" |
USHP-II/GD/Tech/ 94 |
10.08.2022 |
|
USHP-II Kangan |
Mechanical |
Power house |
|
|
NIO |
Corrigendum for "Survey, Design, Engineering, Procurement, Manufacturing, Supply, Erection, Testing And Commissioning of 132 KV Double Circuit Transmission Line For Evacuation Of Power From 37.5 MW Parnai HEP (Bhata Durian) To 132133 KV Draba Grid Station/ Switchyard and 02 No 132KV Line Bays
At The Receiving End i.e. 132/33 kV Draba Grid Station Distt. Poonch J&K Through Turnkey Mode". |
03 of 2022-23 |
10-08-2022 |
2022_SPDC_174394_1 |
37.5 MW Parnai HEP |
|
Bhata Durian, J&K |
|
24 Months |
Corrigendum-IV |
NIO for "Rebabitating of Pads for unit 3rd" |
USHP-II/GD/Tech/ 91 |
08.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Laying, Testing and commissioning of 11 and 33 kv line." |
USHP-II/GD/Tech/ 90 |
08.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply, installation and commissioning of lightning arresters/surge counters as per scope." |
USHP-II/GD/Tech/ 81 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply, installation and commissioning of star delta panels for EOC motors" |
USHP-II/GD/Tech/ 83 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply and installation of LED lighting around and inside power house." |
USHP-II/GD/Tech/ 80 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Additional automation works of power house USHP-II Kangan" |
USHP-II/GD/Tech/ 82 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply, installation and commissioning of 2 ton Hot and cold AC for battery room" |
USHP-II/GD/Tech/ 84 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply, installation and commissioning of 20 HP HS motor and 30 LPM pump for unit-II" |
USHP-II/GD/Tech/ 79 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIO for "Supply, installation and commissioning of 11 KV VCBs, MOCB, earthing etc. as per scope mentioned in NIO" |
USHP-II/GD/Tech/ 84 |
06.08.2022 |
|
USHP-II Kangan |
Electrical. |
Power house |
|
|
NIO |
NIT for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system,
connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares / accessories alongwith
dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKSPDC." |
GD/LJHP/Tech/36-46 |
03.08.2022 |
2022_SPDC_182431_1 |
LJHP |
Electrical. |
LJHP Power house Chahla |
Rs.1639.00 Lacs |
365 days |
NIT |
Quotation for "Procurement of 1250 Amp 11 kVA VCB Panel HT". |
MECH/BHEP/484-86 |
02.08.2022 |
|
BHEP |
ELECTRICAL |
DAM of BHEP. |
|
30 days |
Quotation |
NIT for "Permanent restoration of power canal of 22.5 MW USHP-I Sumbal including all allied works". |
02 ESSD of 2022-23 |
02.08.2022 |
2022_SPDC_182016¬_1 |
CMD SVP Kangan (USHP-I Sumbal) |
CIVIL WORKS |
SUMBAL. |
Rs.3,96,00,000.00/- |
90 days |
NIT |
NIT for "Construction of Balance work of Corporate Office Complex of JKPDC at Rajbagh, Srinagar, Kashmir-J&K". |
02 ESSD of 2022-23 |
28.07.2022 |
2022_SPDC_181420_1 |
New Corporate Office Complex of JKPDC at Rajbagh, Srinagar |
CIVIL WORKS |
RAJBAGH SRINAGAR. |
Rs.22,64,00,000/- |
540 days |
NIT |
Budgetary offer for "Works of CHEP-I, II, III & Bhaderwah HEP". |
GEN/PDC/U/677-80 |
25.07.2022 |
|
CHEP-I, II, III & Bhaderwah HEP |
O&M / Capital works |
Udhampur & Bhaderwah HEP |
|
|
Budgetary Offer |
Corrigendum for "EPC Contract package for Balance Work of Lower Kalnai HEP(48MW)" |
JKSDPC/LKHEP/4332 |
23.07.2022 |
2022_SPDC_165338_1 |
Lower Kalnai HEP |
EPC |
KALNAI,DISTT KISHTWAR |
Rs 565Cr |
48 months |
CORRIGENDUM |
Corrigendum for "EPC Contract package for Balance Work of Lower Kalnai HEP(48MW)" |
JKSDPC/LKHEP/3087 |
18.07.2022 |
2022_SPDC_165338_1 |
Lower Kalnai HEP |
EPC |
KALNAI,DISTT KISHTWAR |
Rs 565Cr |
48 months |
CORRIGENDUM |
NOI for "Cost of various materials for supply of material for repair and restoration for grid and allied lines of BHEP Chanderkote". |
EPD/BHEP/120-122 |
16.07.2022 |
|
Baglihar HEP |
Electrical |
BHEP-II Power house ,Chanderkote Ramban |
|
|
NIO |
NOI for "Cost of various materials for safety equipments and uniform at BHEP Chanderkote"". |
EPD/BHEP/119 |
16.07.2022 |
|
Baglihar HEP |
Electrical |
BHEP-II Power house ,Chanderkote Ramban |
|
|
NIO |
NOI for "Cost of various materials for supply of spares and consumables for grid and allied lines of BHEP Chanderkote". |
EPD/BHEP/123-125 |
16.07.2022 |
|
Baglihar HEP |
Electrical |
BHEP-II Power house ,Chanderkote Ramban |
|
|
NIO |
Cancellation Notice of "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares / accessories alongwith
dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC". |
GD/LJHP/Tech/07-17 |
07.07.2022 |
2022_SPDC_169366_1 |
LJHP |
Electrical |
LJHP Power house Chahla. |
1639.00 Lacs |
365 Days |
Cancellation Notice |
NIO for " Dismantling of the existing damaged Control unit and replacing it by way of Supply, installation, testing & commissioning
of a new one (as per the specifications of the existing one) including all taxes & duties and transportation etc. (complete job)". |
GTD/PDC/TS/86–89 |
07.07.2022 |
|
MHEP Pahalgam |
Electrical |
Pahalgam Powerhouse |
3.90 Lacs |
Seven (07) Days |
NIO |
Budgetary Offer " Works of CHEP-I, II, III & Bhaderwah HEP". |
GEN/PDC/U/617-20 |
06.07.2022 |
|
CHEP-I, II, III & Bhaderwah HEP |
O&M works |
Udhampur & Bhaderwah HEP |
|
|
Budgetary Offer |
NIT for "Re-babitating of bearing pads and refurbishment of runner alongwith allied works as per scope" . |
02 of 2022-23 |
03.07.2022 |
|
USHP-II Kangan |
Electro-Mechanical |
Power House |
68.06 lacs |
45 Days |
NIT |
NIT for " Appointment of Cost Accounting firm for preparation of Cost Accounting records of JKSPDCL for Financial years 2019-20,2020-
21 & 2021-22". |
PDC/Fin/2707-09 dated 01.07.2022 |
01.07.2022 |
GEM/2022/B/2311898 |
|
Cost Accounting Records of JKSPDCL |
Srinagar/Jammu,JKUT |
|
08 months from the date of LOA |
NIT |
NIT for " Appointment of Secretarial Auditor for the financial years 2021-22 & 2022-23". |
02 of 2022 dated 30.06.2022 |
30.06.2022 |
2022_SPDC_176895_1 |
|
Appointment of Secretarial Auditor for the financial years 2021-22 & 2022-23 |
Jammu,JKUT |
|
|
NIT |
NIT for " EPC Contract Package of New Ganderbal Hydro Electric Project (93MW) located in Distt. Ganderbal in UT of Jammu and Kashmir, India". |
JKSPDCL/e-RfQ&e-RfP/2022/02 |
06.06.2022 |
2022_SPDC_172779_1 |
93MW NGHEP |
|
Ganderbal ,J&K |
|
48 months |
NIT |
Cancellation Notice "Construction of Balance work of Corporate Office Complex of JKPDC at Rajbagh, Srinagar, Kashmir-J&K". |
No.01ESSD 2022-23 |
23.06.2022 |
2022_SPDC_166457_1 |
New Corporate Office Complex of JKPDC at Rajbagh, Srinagar |
CIVIL |
RAJBAGH SRINAGAR. |
Rs.22,64,00,000 /- |
540 days |
Cancellation Notice |
Corrigendum for "Survey, Design, Engineering, Procurement, Manufacturing, Supply, Erection, Testing And Commissioning of 132 KV Double Circuit Transmission Line For Evacuation Of Power From 37.5 MW Parnai HEP (Bhata Durian) To 132133 KV Draba Grid Station/ Switchyard and 02 No 132KV Line Bays
At The Receiving End i.e. 132/33 kV Draba Grid Station Distt. Poonch J&K Through Turnkey Mode". |
03 of 2022-23 |
17-06-2022 |
2022_SPDC_174394_1 |
37.5 MW Parnai HEP |
|
Bhata Durian, J&K |
|
24 Months |
Corrigendum-I |
Cancellation Corrigendum for E NIT"Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24" |
01 of 2022 |
21-06-2022 |
2022_SPDC_170689_1 |
|
Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24 |
Corporate Office, Jammu |
|
|
Cancellation Corrigendum |
Survey, Design, Engineering, Procurement, Manufacturing, Supply, Erection, Testing And Commissioning of 132 KV Double Circuit Transmission Line For Evacuation Of Power From 37.5 MW Parnai HEP (Bhata Durian) To 132133 KV Draba Grid Station/ Switchyard and 02 No 132KV Line Bays
At The Receiving End i.e. 132/33 kV Draba Grid Station Distt. Poonch J&K Through Turnkey Mode. |
03 of 2022-23 |
17-06-2022 |
2022_SPDC_174394_1 |
37.5 MW Parnai HEP |
|
Bhata Durian, J&K |
|
24 Months |
E-NIT |
All Risk Comprehensive package Mega Risk Policy including terrorism and third party liability |
01 of 2022 |
18-06-2022 |
|
900 MW BHEP |
Insurance of BHEP |
Chanderkote Ramban |
Open tender |
1 year |
Corrigendum-II |
All Risk Comprehensive package Mega Risk Policy including terrorism and third party liability |
01 of 2022 |
17-06-2022 |
|
900 MW BHEP |
Insurance of BHEP |
Chanderkote Ramban |
Open tender |
1 year |
Corrigendum |
Survey, Design, Engineering, Procurement, Manufacturing, Supply, Erection, Testing And Commissioning of 132 KV Double Circuit Transmission Line For Evacuation Of Power From 37.5 MW Parnai HEP (Bhata Durian) To 132133 KV Draba Grid Station/ Switchyard and 02 No 132KV Line Bays
At The Receiving End i.e. 132/33 kV Draba Grid Station Distt. Poonch J&K Through Turnkey Mode. |
03 of 2022-23 |
17-06-2022 |
2022_SPDC_174394_1 |
37.5 MW Parnai HEP |
|
Bhata Durian, J&K |
|
24 Months |
E-NIT |
Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares / accessories alongwith
dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC. |
GD/LJHP/Tech/07-17 |
16-06-2022 |
2022_SPDC_169366_1 |
LJHP |
Electrical. |
LJHP Power house Chahla. |
1639.00 Lacs |
365 Days |
E-NIT |
Corrigendum-I for "Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24" |
01 of 2022 |
11-06-2022 |
2022_SPDC_170689_1 |
|
Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24 |
Corporate Office,Jammu |
|
|
Corrigendum-I |
Budgetary Offer for Supply and installation of 75” continuous duty 4K Led Monitor/ Screen for SCADA system inside control room of Power house BHEP-I |
GD/BHEP-I/177-179 |
06-06-2022 |
|
Baglihar HEP StageI |
Electrical Work(Works) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for Supply of Megger make Contact Resistance Measurement kit of 200 Amp for GIS of Power house of BHEP-I |
GD/BHEP-I/192-194 |
06-06-2022 |
|
Baglihar HEP StageI |
Electrical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for Supply of Megger make Contact Resistance Measurement kit of 200 Amp for GIS of Power house of BHEP-I |
GD/BHEP-I/192-194 |
06-06-2022 |
|
Baglihar HEP StageI |
Electrical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for various instrumentation works in the Power house of BHEP-I |
GD/BHEP-I/186-188 |
06-06-2022 |
|
Baglihar HEP StageI |
Electromechanical Works(work) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for Upgradation of 2 nos. 150/35 Mt Capacity EOT cranes installed at machine Hall of Power house of BHEP-I |
GD/BHEP-I/189-191 |
06-06-2022 |
|
Baglihar HEP StageI |
Electromechanical Works(work) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for Supply of Energy Efficient Led lights for Power house of BHEP-I |
GD/BHEP-I/183-185 |
06-06-2022 |
|
Baglihar HEP StageI |
Electrical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
E-NIT |
Budgetary Offer for Dynamic Balancing of Rotor of 150MW, 187.5 rpm vertical Generating Units of Power house BHEP-I |
GD/BHEP-I/180-82 |
06-06-2022 |
|
Baglihar HEP StageI |
Electromechanical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
E-NIT |
All Risk Comprehensive package Mega Risk Policy including terrorism and third party liability |
01 of 2022 |
04-06-2022 |
|
900 MW BHEP |
Insurance of BHEP |
Chanderkote Ramban |
Open tender |
1 year |
E-NIT |
All Risk Comprehensive package Mega Risk Policy including terrorism and third party liability |
01 of 2022 |
04-06-2022 |
|
900 MW BHEP |
Insurance of BHEP |
Chanderkote Ramban |
Open tender |
1 year |
E-NIT Gist |
Extension Notice No. 01 for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of
mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC". |
GD/LJHP/Tech/07-17 |
04-06-2022 |
2022_SPDC_169366_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
Rs1639.00 Lacs |
365 Days |
Extn. Notice |
E-NIT for "Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24" |
01 of 2022 |
25-05-2022 |
2022_SPDC_170689_1 |
|
Appointment of Secretarial Auditor for the financial years 2021-22, 2022-23 and 2023-24 |
Corporate Office,Jammu |
|
|
E-NIT |
Invitation of Quotations for hiring of Guest House |
DQ No. 01 of 2022-23 |
20-05-2022 |
|
Estates Special Sub-Division Srinagar JKPDC |
|
SRINAGAR |
|
|
E-NIT |
Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of
mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC. |
GD/LJHP/Tech/07-17 |
14-05-2022 |
2022_SPDC_169366_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
Rs1639.00 Lacs |
365 Days |
E-NIT |
Cancellation Notice for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of
mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC". |
GD/LJHP/Tech/1103-13 |
12-05-2022 |
2022_SPDC_167259_1 |
LJHP |
Electrical |
LJHP Power house Chahla |
Rs1639.00 Lacs |
365 Days |
Corrigendum |
Corrigendum for "Retender-3 to e-Nit for Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9
compartment of bus coupler bay of GIS (complete job) as specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT". |
GD/BHEP-I/T/514-20 |
26-04-2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs1.19 crores |
14 months |
Corrigendum |
Corrigendum for "EPC Contract package for Balance Work of Lower Kalnai HEP(48MW)" |
eRFQ & eRFP/2022/01 |
30.04.2022 |
2022_SPDC_165338_1 |
Lower Kalnai HEP |
EPC |
KALNAI,DISTT KISHTWAR |
Rs 565Cr |
48 months |
CORRIGENDUM |
Corrigendum for "Retender-2 to e-Nit for Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9
compartment of bus coupler bay of GIS (complete job) as specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT". |
GD/BHEP-I/T/514-20 |
26-04-2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs1.19 crores |
14 months |
Corrigendum |
Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory
spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC.. |
GD/LJHP/Tech/1103-13 |
20-04-2022 |
2022_SPDC_167259_1 |
LJHP |
Electrical |
LJHP Power house Chahla. |
1639.00 Lacs |
365 Days |
NIT |
Corrigendum of Cancellation Notice of "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares / accessories
alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC". |
GD/LJHP/Tech/1074-84 |
20-04-2022 |
2022_SPDC_165572_1 |
LJHP |
Electrical |
LJHP Power house Chahla. |
1639.00 Lacs |
365 Days |
Corrigendum |
NIT for "EPC Contract package for Balance Work of Lower Kalnai HEP(48MW)" |
eRFQ & eRFP/2022/01 |
21.04.2022 |
2022_SPDC_165338_1 |
Lower Kalnai HEP |
EPC |
KALNAI,DISTT KISHTWAR |
Rs 565Cr |
48 months |
NIT |
Corrigendum for "Extension-III to e-Nit for Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9 compartment of bus coupler bay of GIS (complete job) as
specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT". |
GD/BHEP-I/T/507-13 |
14-04-2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs1.19 crores |
14 months |
Corrigendum |
NIO for "Budgetary Offer for SITC of Energy Efficient LED Lights at BHEP-II Power House" |
GEN/BHEP-II/23-24 |
13.04.2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage II |
Electrical |
Chanderkote Ramban |
Rs.6,15,000/- |
05 Days |
NIO |
e-NIT for "Construction of Balance work of Corporate Office Complex of JKPDC at Rajbagh, Srinagar, Kashmir-J&K". |
No.01ESSD 2022-23 |
11.04.2022 |
2022_SPDC_166457_1 |
New Corporate Office Complex of JKPDC at Rajbagh, Srinagar |
CIVIL |
RAJBAGH SRINAGAR. |
Rs.22,64,00,000 /- |
540 days |
NIT |
E-NIT for "Repair s and renovation of sub divisional office at CCD-11, restoration of water supply to the divisional office and repairs to m ain
gate, development of lawn/paths at divisional office" . |
E-NIT 02 of 2022 |
24.03.2022 |
2022_SPDC_165380_1 |
New Ganderbal HEP |
Civil Works |
Preng Kangan and Ganderbal. |
RsRs.2.18 lakhs |
10 days |
NIT |
NIT for "Renovation of AEEs/J.Es residential quarters by way of repairing of floors,ceilings,walls at Headworks Preng." |
E-NIT 01 of 2022 |
24.03.2022 |
2022_SPDC_165323_1 |
New Ganderbal HEP |
Civil Works |
Preng Kangan and Ganderbal. |
Rs4.08867 lakhs |
20 days |
NIT |
Corrigendum for Extension-II to e-Nit for Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9 compartment of bus coupler bay of GIS (complete job) as
specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT. |
GD/BHEP-I/T/500-06 |
08-04-2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs1.19 crores |
14 months |
Corrigendum |
Corrigendum for "Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9 compartment of bus coupler bay of GIS (complete job) as specified in
scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT". |
GD/BHEP-I/T/480-86 |
02.04.2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs1.19 crores |
14 months |
Corrigendum |
E-NIT for "Turnkey package for Design, Engineering, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers
with OFAF cooling type system, connected in Delta–Star configuration by 11KV cables with 35MW/11KV Generator Bus , including Supply of mandatory spares / accessories alongwith dismantling of old existing 14MVA Transformers in phased manner and buy-back 09 No’s of the same at LJHP Power House , Baramulla, JKPDC." |
GD/LJHP/Tech/1074-84 |
28.03.2022 |
2022_SPDC_165572_1 |
LJHP Power house Chahla. |
Electrical. |
LJHP |
Rs.1639.00 Lacs |
365 Days |
E-NIT |
Corrigendum for Annual Maintenance Routine Maintenance and operational support of Electro Mechanical Equipments installed at 450 MW (3x150) BHEP Stage-I for TWO years. |
GD/BHEP-I/T/467-73 |
26.03.2022 |
2022_SPDC_160795_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs.3,42,25,068/- |
2 years |
Corrigendum |
Corrigendum for "Restoration/Up gradation along with Supply of mandatory spares and AMC for Both the Elevators of BHEP-1, JKPDC, Chanderkote, Ramban, UT of J&K-182148" |
GD/BHEP-I/T/460-66 |
26.03.2022 |
2022_SPDC_160692_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs. 35,04,432 |
45 days |
Corrigendum |
NIT for "EPC Contract package for Balance Work of Lower Kalnai HEP(48MW)" |
eRFQ & eRFP/2022/01 |
25.03.2022 |
2022_SPDC_165338_1 |
Lower Kalnai HEP |
EPC |
KALNAI,DISTT KISHTWAR |
Rs 565Cr |
48 months |
NIT |
Corrigendum for "Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9 compartment of bus coupler bay of
GIS (complete job) as specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT" |
GD/BHEP-I/T/446-53 |
24.03.2022 |
2022_SPDC_162628_2 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs 1.19 crores |
14 months |
Corrigendum |
Corrigendum for Extension-2 of "Annual Maintenance Routine Maintenance and operational support of
Electro Mechanical Equipments installed at 450 MW (3x150) BHEP Stage-I for TWO years". |
GD/BHEP-I/T/417-23 |
19.03.2022 |
2022_SPDC_160692_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs 3,42,25,068/- |
2 years |
Corrigendum |
Corrigendum for Extension-2 of "Restoration/Up gradation along with Supply of
mandatory spares and AMC for Both the Elevators of BHEP-1, JKPDC, Chanderkote, Ramban, UT of J&K-182148" |
GD/BHEP-I/T/410-16 |
19.03.2022 |
2022_SPDC_160692_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs. 35,04,432 |
45 days |
Corrigendum |
Budgetary Offer for "AMC Works of CHEP-I" |
GEN/PDC/U/1646-49 |
15.03.2022 |
|
CHEP-I |
O&M works |
Udhampur |
|
07 Days |
Quotation |
Quotation Call/Offer of Supply for "Supply of urgent spares for Power house of BHEP-I Chanderkote" |
GD/BHEP-I/1399-1401 |
14.03.2022 |
|
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
|
07 Days |
Quotation |
Corrigendum for "Annual Maintenance Routine Maintenance and operational
support of Electro Mechanical Equipments installed at 450 MW (3x150) BHEP Stage-I for TWO years". |
GD/BHEP-I/T/394-97 |
12.03.2022 |
2022_SPDC_160795_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs.3,42,25,068/- |
2 years |
Corrigendum |
NIT for "Face-lifting of Officer’s cabin by way of providing doors at JKPDC Corporate Office Srinagar". |
E-NIT NO: 09 of 2021-22 |
10.03.2022 |
2022_SPDC_163898_1 |
CORPORATE ASSET MANAGEMENT |
CIVIL WORKS |
JKPDC CORPORATE OFFICE EXHIBITION GROUNDS SRINAGAR. |
Rs.58,900/- |
15 days |
E-NIT |
Corrigendum for "Annual Maintenance Routine Maintenance and
operational support of Electro Mechanical Equipments installed at 450 MW (3x150) BHEP Stage-I for TWO years". |
GD/BHEP-I/T/388-93 |
08.03.2022 |
2022_SPDC_160795_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs3,42,25,068 |
2 years |
Corrigendum |
Cancellation Notice for " Branch cutting for 11KV & 33 KV lines from
LJHP power house to Barrage at LJHP 3 x 35 MW LJHP, Baramulla |
GD/LJHP/Tech/1046-52 |
08.03.2022 |
2022_SPDC_161600_1 |
LJHP |
Civil |
LJHP Powerhouse Chahla. |
Rs.0.56 Lacs |
15 days |
Corrigendum |
Corrigendum for "Restoration/Up gradation along with Supply of mandatory spares and AMC for
Both the Elevators of BHEP-1, JKPDC, Chanderkote, Ramban, UT of J&K-182148" |
GD/BHEP-I/T/375-80 |
08.03.2022 |
2022_SPDC_160692_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs.35,04,432 |
45 days |
Corrigendum |
E-NIT for Supply, Installation, testing and Commissioning for rectification works of (GE make, B142 model) G9 compartment of bus coupler bay of GIS (complete job)
as specified in scope of work, for 450MW (3x150) Baglihar Hydro Electric project stage-I, Chanderkote, J&K UT. |
GD/BHEP-I/T/352-59 |
02.03.2022 |
2022_SPDC_162628_1 |
Baglihar HEP Stage I |
Electrical |
Chanderkote Ramban |
Rs 1.19 crores |
14 months |
E-NIT |
Ex Notice for "Procurement of Survey Items (GPS, Measuring Tapes and Digital Planimeter etc.)" |
EE/CID/PDC/SPR/03 |
02.03.2022 |
2022_SPDC_159221_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 1.19 lac |
30 days |
Ex Notice |
Ex Notice for "Providing And Fixing Chain Link Fencing Around JKSPDC Land at Wanpora Gurez.". |
EE/CID/PDC/SPR/01 |
02.03.2022 |
2022_SPDC_159202_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 6.395 lacs |
60 days |
Ex Notice |
Extension Notice for "Land scaping of water-logged area including upgradation of approach road of Divisional office Sopore.". |
EE/CID/PDC/SPR/01 |
02.03.2022 |
2022_SPDC_159185_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 5.15 lacs |
60 days |
Ex Notice |
Extension Notice for "Supply & Installation of 11 Mtrs & 9 Mtrs ST Poles for stabilization of 33KV line and 11KV line by way of replacement of old damaged wooden poles conductors, disc insulators, clamps etc from
LJHP power house to Peernia & Peernia to Barrage respectively at LJHP" |
GD/LJHP/Tech/1016-23 |
28/02/2022 |
2022_SPDC_161591_1 |
LJHP |
Electrical |
LJHP Power House Chahla |
Rs8.10 Lacs |
30 days |
Ex Notice |
E-NIT for" 5)Construction of crate protection bund on left side of Rayil escape channel USHP-I Sumbal " |
CMD/SVP/K/ 06 of 2021-22 |
02.03.2022 |
2021_SPDC_147589_5 |
CMD SVP Kangan |
Civil |
USHP-I Sumbal |
Rs 297000.00 |
30 Days |
E-NIT |
E-NIT for" 4)Construction of retaining wall at RD 10000ft of USHP-I Sumbal" |
CMD/SVP/K/ 06 of 2021-22 |
02.03.2022 |
2021_SPDC_147589_4 |
CMD SVP Kangan |
Civil |
USHP-I Sumbal |
Rs 302000.00 |
30 Days |
E-NIT |
E-NIT for " 3) Construction of surface drain to arrest the leakages downhill side of water conductor RD 15500 USHP-I Sumbal " |
CMD/SVP/K/ 06 of 2021-22 |
02.03.2022 |
2021_SPDC_147589_3 |
CMD SVP Kangan |
Civil |
USHP-I Sumbal |
Rs 190000.00 |
30 Days |
E-NIT |
E-NIT for "2) Restoration of Damaged parapet and retaining wall by of cement concrete and stone masonary near RD 30000ft of SP Canal Old Ganderbal " |
CMD/SVP/K/ 06 of 2021-22 |
02.03.2022 |
2021_SPDC_147589_2 |
CMD SVP Kangan |
Civil |
Ganderbal |
Rs 707000.00 |
45 Days |
E-NIT |
E-NIT for " 1)Repair of the RMM wall on the uphill side of Power Canal of MHP Pahalgam" |
CMD/SVP/K/ 06 of 2021-22 |
02.03.2022 |
2021_SPDC_147589_1 |
CMD SVP Kangan |
Civil |
Pahalgam |
Rs 341000.00 |
45 Days |
E-NIT |
E-NIT for Repair of 01 Number 14 M.V.A Power transformer, 11/132KV at the Service Bay of LJHP Power House
along with its further installation and commissioning at Unit-3rd of 3x35MW LJHP Power House |
GD/LJHP/Tech/1061-70 |
: 22/02/2022 |
2022_SPDC_161826_1 |
LJHP |
Electrical |
LJHP Power House |
Rs 2.55 Lacs |
10 Days |
E-NIT |
E-NIT for "Repair/rewinding of damaged motors (Continuous Duty) at 3x35 MW, LJHP, Gantamulla, Baramulla" |
GD/LJHP/Tech/1053-60 |
21/02/2022 |
2022_SPDC_161604_1 |
LJHP |
Electrical |
LJHP Powerhouse Chahla |
Rs 3.27 Lacs |
15 Days |
E-NIT |
E-NIT for "Branch cutting for 11KV & 33 KV lines from LJHP power house to Barrage at LJHP 3 x 35 MW LJHP, Baramulla" |
GD/LJHP/Tech/1046-52 |
21/02/2022 |
2022_SPDC_161600_1 |
LJHP |
Civil |
LJHP Powerhouse Chahla |
Rs 0.56 Lacs |
15 Days |
E-NIT |
E-NIT for "Replacement of nonfunctional and damaged lights of main hall of PH for illumination/lighting along with placement of proper lights at other floors like turbine ,MIV etc inside PH along with renovation and revival of its circuitry, protection and control along with replacement of damaged cabling/wiring. Providing of new flood lights at 132KV switchyard, divisional stores complete job including replacement of
damaged cables/wiring, protection & control and providing of protection and control of 3x35 MW LJHP power house" |
GD/LJHP/Tech/1038-45 |
21/02/2022 |
2022_SPDC_161597_1 |
LJHP |
Electrical. |
LJHP Power House Chahla |
Rs8.56 Lacs |
60 days |
E-NIT |
E-NIT for "Replacement of damaged false ceiling of machine hall and control room of LJHP power house including removal of damaged ceiling lights/ wiring etc and placement of fresh LED flood and panel lights with associated wiring and control and
protection, cleaning of flooring of power house and replacement of flooring of stairs" |
GD/LJHP/Tech/1024-37 |
21/02/2022 |
2022_SPDC_161596_1 |
LJHP |
Civil |
LJHP Power House Chahla |
Rs54.00 Lacs |
90 days |
E-NIT |
E-NIT for "Supply & Installation of 11 Mtrs & 9 Mtrs ST Poles for stabilization of 33KV line and 11KV line by way of replacement of old damaged wooden poles conductors, disc insulators, clamps etc from
LJHP power house to Peernia & Peernia to Barrage respectively at LJHP" |
GD/LJHP/Tech/1016-23 |
21/02/2022 |
2022_SPDC_161591_1 |
LJHP |
Electrical |
LJHP Power House Chahla |
Rs8.10 Lacs |
30 days |
E-NIT |
Cancellation Notice for "Replacement of nonfunctional and damaged lights of main hall of PH for illumination/lighting along with placement of proper lights at other floors like turbine ,MIV etc inside PH along with renovation and revival of its circuitry, protection and control along with replacement of damaged cabling/wiring. Providing of new flood lights at 132KV switchyard, divisional stores complete job including replacement of damaged
cables/wiring, protection & control and providing of protection and control of 3x35 MW LJHP power house" |
GD/LJHP/Tech/845-53 |
19/02/2022 |
2021_SPDC_155579_1 |
LJHP |
Electrical |
LJHP Power House Chahla |
Rs8.56 Lacs |
60 days |
Cancellation Notice |
Cancellation Notice for "Replacement of damaged false ceiling of machine hall and control room of LJHP power house including removal of damaged ceiling lights/ wiring etc and placement of fresh LED flood and panel lights with associated wiring and control and protection, cleaning of
flooring of power house and replacement of flooring of stairs" |
GD/LJHP/Tech/918-30 |
19/02/2022 |
2021_SPDC_155728_1 |
LJHP |
Civil |
LJHP Power House |
Rs.54.00 Lacs |
90 days |
Cancellation Notice |
NIO for "Modification in existing 400 KV Kishenpur-Wanpoh line at Pot head yard of 3X150 MW BHEP-II Power House." |
GEN/BHEP-II/1286-88 |
19/02/2022 |
|
Baglihar HEP Stage II |
Electrical |
Chanderkote Ramban |
|
|
NIO |
E-NIT for "Repair/Restoration of HT, LT Overhead Lines from Powerhouse to Headworks at MHEP Pahalgam". |
GTD/PDC/TS/724 – 731 |
15/02/2022 |
2022_SPDC_160692_1 |
MHEP Pahalgam |
Electrical |
Pahalgam Powerhouse |
Rs.4.75 Lacs |
10 days |
E-NIT |
E-NIT for "Restoration/Up gradation along with Supply of mandatory spares and AMC for Both the Elevators of BHEP-1, JKPDC, Chanderkote, Ramban, UT of J&K-182148". |
GD/BHEP-I/T/327-33 |
15/02/2022 |
2022_SPDC_160692_1 |
Baglihar HEP Stage I |
Electromechanical |
Chanderkote Ramban |
Rs. 35,04,432/- |
45 days |
E-NIT |
Corrigendum for "Supply of various Hydro Mechanical spares for 450MW Power Houseof BHEP-II". |
GEN/BHEP-II/09 of 2021 |
15/02/2022 |
|
Baglihar HEP Stage II |
Electromechanical |
Chanderkote Ramban |
Rs.72,61,605/- |
05 Months from the date of issue of LOA. |
Corrigendum Notice |
Budgetary offer for "Supply of MICOM relays for Generating Unit’s protection system of power house BHEP-I Chanderkote". |
GD/BHEP-I/252-54 |
14/02/2022 |
|
Baglihar HEP Stage I |
Electrical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
Budgetary offer |
Budgetary offer for "Offer for Supply of Carbon Brushes for Synchronous Generators of Power house BHEP-I Chanderkote". |
GD/BHEP-I/255-57 |
14/02/2022 |
|
Baglihar HEP Stage I |
Electrical Work(Procurement) |
Chanderkote Ramban |
|
07 days |
Budgetary offer |
NIO for "Additional automation works alongwith supply of essential of spares". |
USHP-II/GD/Tech/620 |
12.02.2022 |
2022_SPDC_160234_1 |
USHP-II Kangan |
Electrical |
Power house |
|
100 days |
NIO |
Notice for "Permanent restoration of Wangath link canal RD-4640M to RD-5261M near Burnbugh village Kanga" |
CMD/USHP-II/07of 2021-22 |
11.02.2022 |
2022_SPDC_160234_1 |
Kanga Ganderbal |
Civil works |
Kanga Ganderbal |
129.43 Lacs |
60 days |
E-NIT |
Notice for "Replacement of power cable of dewatering pump no. 1 installed in Dam gallery of BHEP Chanderkote" |
ENIT no. 21 of 2021-22 |
10.02.2022 |
2022_SPDC_160089_1 |
BHEP |
Electrical |
BHEP Chanderkote |
8,35,000/- |
45 days |
E-NIT |
Notice for Replacement of old/damaged of light sign boards inside dam galleries
entrance point, EL. 836,EL. 816, EL.795, EL.766, EL.736, EL.714 , left bank staircase & interconnected tunnel of BHEP-1 Chanderkote |
ENIT no 20 of 2021-22 |
10.02.2022 |
2022_SPDC_160080_1 |
BHEP |
Electrical |
BHEP Chanderkote |
3,95,000/- |
30 days |
E-NIT |
Cancellation Notice for "Renovation and Repairing of Divisional (XEN) office building of Gas Turbine at Pampore". |
JKSPDC/Tech/8303-26 |
09.02.2022 |
|
Gas Turbine Pampore |
|
(XEN) Office Building |
|
|
Cancellation Notice 3 |
Extension Notice for "Supply of various Automation spares for 450MW power house of BHEP-II". |
GEN/BHEP-II/10 of 2021 |
09.02.2022 |
|
Baglihar HEP Stage II |
ELECTRICAL |
Chanderkote Ramban,JK |
Rs. 11,80,387 |
60 days from the date of issue of LOA |
Ex Notice 3 |
Extension Notice for "Supply of various Hydro mechanicalspares for 450 MW power house of BHEP-II". |
GEN/BHEP-II/09 of 2021 |
09.02.2022 |
|
Baglihar HEP Stage II |
ELECTROMECHANICAL Works |
Chanderkote Ramban,JK |
Rs. 72,61,605 |
5 months from the date of issue of LOA. |
Ex Notice 3 |
NIO for "Detailed inspection and maintenance of 400KV GIS System at 3X150 MW BHEP-II Power House" |
GEN/BHEP-II/1208-10 |
04.02.2022 |
|
Baglihar HEP Stage II |
ELECTRICAL |
Chanderkote Ramban |
|
|
NIO |
NIO for "Procurement of Dewatering pumps ( 110KW- 01 Nos and 141 KW - 01 Nos ) and associated spares" |
GEN/BHEP-II/1208-10 |
04.02.2022 |
|
Baglihar HEP Stage II |
ELECTRIOMECHANICAL |
Chanderkote Ramban |
|
|
NIO |
NIO for "Maintenance of elevators of power house BHEP-II". |
GEN/BHEP-II/1211-12 |
04.02.2022 |
|
Baglihar HEP Stage II |
ELECTRIOMECHANICAL |
Chanderkote Ramban |
|
|
NIO |
E-NIT for "Procurement of Survey Items (GPS, Measuring Tapes and Digital Planimeter etc.)" |
EE/CID/PDC/SPR/03 |
04.02.2022 |
2022_SPDC_159221_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 1.19 lac |
30 days |
E-NIT |
E-NIT for "Construction of boundary pillars around 250-acre JKPDC land at Ningli, Sopore." |
EE/CID/PDC/SPR/02 |
04.02.2022 |
2022_SPDC_159218_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 3.49 lac |
45 days |
E-NIT |
E-NIT for "Repair & renovation of chowkidar hut at Divisional office, Sopore". |
EE/CID/PDC/SPR/02 |
04.02.2022 |
2022_SPDC_159211_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 1.429 lac |
60 days |
E-NIT |
E-NIT for "Providing And Fixing Chain Link Fencing Around JKSPDC Land at Wanpora Gurez.". |
EE/CID/PDC/SPR/01 |
04.02.2022 |
2022_SPDC_159202_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 6.395 lacs |
60 days |
E-NIT |
E-NIT for "Land scaping of water-logged area including upgradation of approach road of Divisional office Sopore.". |
EE/CID/PDC/SPR/01 |
04.02.2022 |
2022_SPDC_159185_1 |
Survey & Investigation |
Civil |
Sopore and Gurez |
Rs 5.15 lacs |
60 days |
E-NIT |
E-NIT for "Repairing and commissioning of GOP Pumps of USHP-I, Sumbal". |
GDS/21 of 2021-22 |
03.02.2022 |
2022_SPDC_159261_1 |
2 X1 1.3 MW, USHP-1st |
Mechanical |
Sumbal, Kangan |
Rs 0.70 lac |
15 days |
E-NIT |
E-NIT for "Clearance of trash at forebay and other gate sites of USHP-I, Sumbal". |
GDS/20 of 2021-22 |
03.02.2022 |
2022_SPDC_159258_1 |
2 X1 1.3 MW, USHP-1st |
Civil |
Sumbal, Kangan |
Rs 1.00 lac |
15 days |
E-NIT |
E-NIT for "SITC of security ID system, door metal detector and hand metal detector". |
GDS/19 of 2021-22 |
03.02.2022 |
2022_SPDC_159255_1 |
2 X1 1.3 MW, USHP-1st |
Security |
Sumbal, Kangan |
Rs 2.00 lacs |
15 days |
E-NIT |
E-NIT for "Repairing of 250 KVA transformer ". |
GDS/18 of 2021-22 |
03.02.2022 |
2022_SPDC_159251_1 |
2 X1 1.3 MW, USHP-1st |
Electrical |
Sumbal, Kangan |
Rs 1.17 lacs |
15 days |
E-NIT |
Extension Notice for "Supply of various Automation spares for 450MW power house of BHEP-II". |
GEN/BHEP-II/10 of 2021 |
02.02.2022 |
|
Baglihar HEP Stage II |
ELECTRICAL |
Chanderkote Ramban,JK |
Rs. 11,80,387 |
60 days from the date of issue of LOA |
Ex Notice 2 |
Extension Notice for "Supply of various Hydro mechanicalspares for 450 MW power house of BHEP-II". |
GEN/BHEP-II/09 of 2021 |
02.02.2022 |
|
Baglihar HEP Stage II |
ELECTROMECHANICAL Works |
Chanderkote Ramban,JK |
Rs. 72,61,605 |
5 months from the date of issue of LOA. |
Ex Notice 2 |
Budgetary Offer for "AMC Works of CHEP-I". |
GEN/PDC/U/1357 |
01.02.2022 |
|
CHEP-I |
O&M works |
Udhampur |
|
|
Budgetary Offer |
Notice for "Repairing/Servicing of 250 KVA DG Set." |
GDS/17 of 2021-22 |
31-01-2022 |
2022_SPDC_158858_1 |
2 X1 1.3 MW, USHP-1st |
Mechanical |
Sumbal, Kangan |
Rs 0.40 Lacs |
10 Days |
NIT |
Notice for "Supply of safety items". |
GDS/16 of 2021-22 |
31-01-2022 |
2022_SPDC_158855_1 |
2 X1 1.3 MW, USHP-1st |
Supply |
Sumbal, Kangan |
Rs.2 Lacs |
20 Days |
NIT |
Notice for "Supply of various testing equipments". |
GDS/ 15 of 2021-22 |
31-01-2022 |
2022_SPDC_158854_1 |
2 X1 1.3 MW, USHP-1st |
Supply |
Sumbal, Kangan |
Rs.6 Lacs |
20 Days |
NIT |
Corrigendum Notice for "Supply of various hydro mechanical spares for 450 MW power house of BHEP-II.". |
GEN/BHEP-II/069 |
29.01.2022 |
|
Baglihar HEP Stage II |
ELECTROMECHANICAL |
Chanderkote Ramban |
Rs.72,61,605 |
5 months from the date of issue of LOI/LOA |
Corrigendum Notice |
Ex Notice for "Reconditioning and replacement of damaged parts of 2MVA, 3.3kV/11kV Transformer of Unit – II at MHEP Pahalgam". |
GTD/PDC/TS/675 – 682 |
27.01.2022 |
2022_SPDC_156112_1 |
MHEP Pahalgam |
ELECTRICAL |
Pahalgam Powerhouse |
Rs.1.64 Lacs |
Ten (10) Days |
Ex Notice |
Extension Notice for "Supply of various Automation spares for 450MW power house of BHEP-II". |
GEN/BHEP-II/10 of 2021 |
25.01.2022 |
|
Baglihar HEP Stage II |
ELECTRICAL |
Chanderkote Ramban,JK |
Rs. 11,80,387 |
60 days from the date of issue of LOA |
Ex Notice |
Extension Notice for "Supply of various Hydro mechanicalspares for 450 MW power house of BHEP-II". |
GEN/BHEP-II/09 of 2021 |
25.01.2022 |
|
Baglihar HEP Stage II |
ELECTROMECHANICAL Works |
Chanderkote Ramban,JK |
Rs. 72,61,605 |
60 days from the date of issue of LOA |
Ex Notice |
Extension Notice-3 for "SUPPLY OF B&K MAKE VIBRATION CARDS VB-430,VB-410 & VIBRATION SENSORS IN08,VS068 as per BOQ" |
GEN/BHEP-II/06 of 2021 |
22.01.2022 |
|
Baglihar HEP Stage II |
ELECTRICAL WORKS |
Chanderkote Ramban,JK |
Rs. 75,26,512 |
60 days from the date of issue of LOA |
Ex Notice |
Corrigendum No.2 for "Construction of balance work of Corporate Office Complex of JKPDC at Rajbagh, Srinagar, Kashmir-JK" |
E-NIT 08 of 2021 Dt.01.01.2022 |
22.01.2022 |
|
CAPITAL WORKS |
CIVIL AND ELECTRICAL WORKS |
Rajbagh Srinagar,JK |
22.64 Crores |
18 Calendar months |
Corrigendum |
Extension in Notice inviting Bids for "Reconditioning and replacement of damaged parts of 2MVA, 3.3kV/11kV
Transformer of Unit – II at MHEP Pahalgam" |
GTD/PDC/TS/657–664 |
19/01/2022 |
2022_SPDC_156112_1 |
MHEP Pahalgam |
Electrical |
Pahalgam Powerhouse JK |
Rs 1.64 Lacs |
10 days |
Ex.Notice |
Renovation Modernization and Upgradation (RMU) of Mohura Hydroelectric Power Project of 10.5 MW (2x 5.25 MW)" |
JKSPDC/MOHURA/PMDP/8026 |
19/01/2022 |
2022_SPDC_157609_1 |
Mohura HEP Baramulla |
|
|
|
10 days |
Gist |
NIO for "Trash clearance from trash racks of various beats of water conductor of USHP-II kangan" |
USHP-II/GD/Tech/556057 |
12/01/2022 |
|
USHP-II Kangan |
Mechanical/Civil |
Gate sites |
|
01 year |
NIO |
NIT for "Stage contract for emergency/Unforeseen works of CMD USHP-II Kangan caused due to natural climates/ Force majeure
(a)Berm clearance of canal approach road between RD-3900 to RD-4200 mtrs of wangath link channel of USHP-II Kangan
(b) Snow clearance of water conductor, approach road, beats, forebay, BR, power house, office complex and residential colony of USHP-II Kangan for 2021-22
(c)Slip Clearance from OLC of Sumbal link channel USHP-II Kangan including Provision for unforseen slips (adv cost 10.04 lacs)
" |
CMD/USHP-II/06 of 2021-22 |
17/01/2022 |
2022_SPDC_157417_1 |
CMD USHP-II Kangan JK |
Civil works |
Kangan Ganderbal |
Rs. 10.04 lacs |
365 days |
E-NIT |
Ex. Notice for "SUPPLY OF B&K MAKE VIBRATION
CARDS VB-430,VB-410 & VIBRATION SENSORS IN08,VS068 as per BOQ" |
GTD/PDC/TS/602–609 |
15/01/2022 |
|
Baglihar HEP Stage II |
Electrical |
Chanderkote Ramban |
Rs. 75,26,512 |
60 days from the date of issue of LOA |
Ex.Notice |
Ex. Notice for "Supply of Flooring/Furnishing for Subdivisional office, Shift
Staff rooms in PowerHouse & Head works at MHEP Pahalgam" |
GTD/PDC/TS/602–609 |
11/01/2022 |
2021_SPDC_155173_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs 3.00 Lacs |
07 days |
Ex.Notice |
Ex. Notice for "Supply of Mechanical Spares for MHEP Pahalgam" |
GTD/PDC/TS/594–601 |
11/01/2022 |
2021_SPDC_155172_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs 0.6135 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repairing/Restoration of 7.5HP, 3-Phase, 415V, 1450 rpm, 50Hz Dewatering Pump by way of
replacement of Damaged/Worn-out parts installed in Machine Hall at MHEP Pahalgam" |
GTD/PDC/TS/586–593 |
11/01/2022 |
2021_SPDC_155170_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs.98 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repair of 2 Nos. 15KVA Servo Stabilizers, 63KVA Transformer, Electric Panels and allied works at Forebay and Headworks at MHEP Pahalgam" |
GTD/PDC/TS/578–585 |
11/01/2022 |
2021_SPDC_155168_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs1.302 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Illumination in and outside Powerhouse & Headworks at MHEP Pahalgam" |
GTD/PDC/TS/570–577 |
11/01/2022 |
2021_SPDC_155167_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs2.11 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repair of 4Nos. 11kV, VCBs at MHEP Pahalgam" |
GTD/PDC/TS/562–569 |
11/01/2022 |
2021_SPDC_155166_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 0.492 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Rewinding / Repairing of Induction Motors for MHEP Pahalgam" |
GTD/PDC/TS/554–561 |
11/01/2022 |
2021_SPDC_155165_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 0.25 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Supply of Electrical spares" |
GTD/PDC/TS/546 –553 |
11/01/2022 |
2021_SPDC_155164_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 1.38636 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Supply, installation, testing and commissioning of New Battery
Bank alongwith Charger at MHEP Pahalgam" |
GTD/PDC/TS/538–545 |
11/01/2022 |
2021_SPDC_155163_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 9.00 Lacs |
07ays |
Ex.Notice |
Extension Notice No 01 of E-Nit No: GD/LJHP/36 of 2021-22 "Providing , installation ,testing and commissioning of additional equipments like hard drives, LED,
media convertors etc required for smooth functioning CCTV system of PH including replacement, repairs and restoration of CCTV system at barrage for providing proper surveillances for LJHP 3 x 35 MW, Baramulla" |
GD/LJHP/Tech/904-12 |
10.01.2022 |
2021_SPDC_155593_1 |
LJHP JK |
Electro Mech. |
LJHP Powerhouse Chahla. |
4.23 Lacs |
30 days |
Ex. Notice |
Corrigendum to E-NIT No 38 of 2021-22 for "Painting Interior of LJHP Powerhouse Building" |
GD/LJHP/Tech/931-43 |
10.01.2022 |
2021_SPDC_155729_1 |
LJHP JK |
Civil |
LJHP Power House |
8.63 Lacs |
60 days |
Corrigendum Notice |
Notice inviting offer for "Comprehensive maintenance of gates" |
USHP-II/GD/Tech/ 554-55 |
10.01.2022 |
|
USHP-II Kangan JK |
Mechanical |
Gate sites along both power canals |
|
60 days |
NIO |
Notice inviting offer for "Rebabitating of UGB and LGB pads" |
USHP-II/GD/Tech/446 |
10.01.2022 |
|
USHP-II Kangan JK |
Electrical |
Power House |
|
30 days |
NIO |
Notice inviting offer for "DESITC of 220 V, 110 No. 965 AH battery bank along with charger as per scope" |
USHP-II/GD/Tech/525 |
10.01.2022 |
|
USHP-II Kangan JK |
Electrical |
Power House |
|
40 days |
NIO |
Notice inviting offer for "SITC of 50 HP double shaft EOC motor" |
USHP-II/GD/Tech/445 |
10.01.2022 |
|
USHP-II Kangan JK |
Electrical |
Power House |
|
30 days |
NIO |
Extension Notice for "SUPPLY OF B&K MAKE VIBRATION
CARDS VB-430,VB-410 & VIBRATION
SENSORS IN08,VS068 as per BOQ" |
GEN/BHEP-II/06 of 2021 |
10.01.2022 |
|
Baglihar HEP Stage II JK |
ELECTRICAL |
Chanderkote Ramban. |
Rs.75,26,512 |
60 days from the date of issue of LOA |
Ex.Notice |
Extension Notice for "Provision for idle charging of 6 Nos ,60
MVA ,16.5/400 KV GeneratorTransformers at BHEP-II Power House" |
GEN/BHEP-II/07 of 2021 |
08.01.2022 |
|
Baglihar HEP StageII JK |
ELECTRICAL |
Chanderkote Ramban. |
Rs.4,83,83,100 |
90 days from the date of issue of LOA |
Ex.Notice |
Extension Notice No 05 for "Supply, Installation, Testing and Commissioning of new 250 KVA, Diesel Generator with
Primemover complete (415volt, CPCS II with AMF) in LJHP Power House" |
GD/LJHP/Tech/667-75 |
07.01.2022 |
2021_SPDC_149024_1 |
LJHP JK |
Electro Mech. |
LJHP Powerhouse Chahla. |
Rs. 19.54 Lacs |
30 days |
Ex.Notice |
Ex. Notice for "Provision for idle charging of 6 Nos ,60
MVA ,16.5/400 KV Generator Transformers at BHEP-II Power House" |
GEN/BHEP-II/07 of 2021 |
06.01.2022 |
|
Baglihar HEP StageII JK |
Electrical |
Chanderkote Ramban |
Rs. 4,83,83,100 |
90 days from the date of issue of LOA |
Ex.Notice |
Ex. Notice for "Various repairs & maintenance Works: Routine maintenance of 132/33/11 KV Grid station Chanderkote, 33/11 KV R/Station
Dharmund, 11 KV HT Feeders, LT lines and receiving station Dharmund, Oil testing of transformers and breakers etc. " |
EPD-04 of 2021 |
06.01.2022 |
2021_SPDC_153601_1 |
Baglihar HEP StageII JK |
Electrical |
BHEP,Chanderkote Ramban |
Rs. 44,78,090/- Lacs |
60 days |
Ex.Notice |
Corrigendum of E-Nit No: GD/LJHP/36 of 2021-22 "Providing , installation ,testing and commissioning of additional equipments like hard drives, LED,
media convertors etc required for smooth functioning CCTV system of PH including replacement, repairs and restoration of CCTV system at barrage for providing proper surveillances for LJHP 3 x 35 MW, Baramulla" |
GD/LJHP/Tech/904-12 |
06/01/2022 |
2021_SPDC_155593_1 |
MHEP Pahalgam |
Electro–Mechanical |
LJHP Powerhouse Chahla |
Rs 4.23 Lacs |
30 days |
Corrigendum |
Ex. Notice for "Supply of Flooring/Furnishing for Subdivisional office, Shift
Staff rooms in PowerHouse & Head works at MHEP Pahalgam" |
GTD/PDC/TS/523-530 |
05/01/2022 |
2021_SPDC_155173_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs 3.00 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Supply of Mechanical Spares for MHEP Pahalgam" |
GTD/PDC/TS/515-522 |
05/01/2022 |
2021_SPDC_155172_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs 0.6135 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repairing/Restoration of 7.5HP, 3-Phase, 415V, 1450 rpm, 50Hz Dewatering Pump by way of
replacement of Damaged/Worn-out parts installed in Machine Hall at MHEP Pahalgam" |
GTD/PDC/TS/507-514 |
05/01/2022 |
2021_SPDC_155170_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical/Mechanical |
Pahalgam Powerhouse JK |
Rs.98 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repair of 2 Nos. 15KVA Servo Stabilizers, 63KVA Transformer, Electric Panels and allied works at Forebay and Headworks at MHEP Pahalgam" |
GTD/PDC/TS/499-506 |
05/01/2022 |
2021_SPDC_155168_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs1.302 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Illumination in and outside Powerhouse & Headworks at MHEP Pahalgam" |
GTD/PDC/TS/491-498 |
05/01/2022 |
2021_SPDC_155167_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs2.11 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Repair of 4Nos. 11kV, VCBs at MHEP Pahalgam" |
GTD/PDC/TS/483-490 |
05/01/2022 |
2021_SPDC_155166_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 0.492 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Rewinding / Repairing of Induction Motors for MHEP Pahalgam" |
GTD/PDC/TS/475-482 |
05/01/2022 |
2021_SPDC_155165_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 0.25 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Supply of Electrical spares" |
GTD/PDC/TS/467-474 |
05/01/2022 |
2021_SPDC_155164_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 1.38636 Lacs |
07ays |
Ex.Notice |
Ex. Notice for "Supply, installation, testing and commissioning of New Battery
Bank alongwith Charger at MHEP Pahalgam" |
GTD/PDC/TS/459-466 |
05/01/2022 |
2021_SPDC_155163_1 |
MHEP Pahalgam |
Electrical / Electro – Mechanical |
Pahalgam Powerhouse JK |
Rs 9.00 Lacs |
07ays |
Ex.Notice |
E-Tender for "Reconditioning and replacement of damaged parts of 2MVA, 3.3kV/11kV
Transformer of Unit – II at MHEP Pahalgam" |
GTD/PDC/TS/451-458 |
05/01/2022 |
2022_SPDC_156112_1 |
MHEP Pahalgam |
Electrical |
Pahalgam Powerhouse JK |
Rs 1.64 Lacs |
10 days |
E-NIT |
Corrigendum for "Replacement of damaged false ceiling of machine hall and control room of LJHP power house including removal of damaged ceiling lights/ wiring etc and placement of fresh LED flood and panel lights with
associated wiring and control and protection, cleaning of flooring of power house and replacement of flooring of stairs" |
GD/LJHP/Tech/918-30 |
03.01.2022 |
2022_SPDC_155728_1 |
LJHP |
Civil |
LJHP Power house Chahla |
54.00 Lacs |
90 Days |
Corrigendum Notice |
Cancellation Notice for Supply & Installation of 11 Mtrs & 9 Mtrs ST Poles for stabilization of 33KV line and 11KV line by way of replacement of old damaged
wooden poles conductors, disc insulators, clamps etc from LJHP power house to Peernia & Peernia to Barrage respectively at LJHP |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_149028_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
8.10 Lacs |
30 Days |
Cancellation Notice |
Corrigendum for "Painting Interior of LJHP Powerhouse Building" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2022_SPDC_155729_1 |
LJHP |
Civil |
LJHP Power house Chahla |
8.63 Lacs |
60 Days |
E-NIT |
Corrigendum for "Procurement of Safety equipments like link rod, HV gloves, safety jackets, earthing rod, safety tubes, safety shoes,
life saving jackets, uniforms, dangris etc and safety items related to COVID for 3x35 MW LJHP" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155587_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
5.38 Lacs |
30 Days |
E-NIT |
Corrigendum for "Complete Repair/Renovation of 03 No of head regulator gates by way of replacement of reduction gear boxes roller bushes, side plates,
seal plates & rubber seals, joining plates, guide rollers etc at head works Barragee" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155581_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
11.74 Lacs |
30 Days |
E-NIT |
Corrigendum for Replacement of nonfunctional and damaged lights of main hall of PH for illumination/lighting along with placement of proper lights at other floors like turbine ,MIV etc inside PH along with renovation and revival of its circuitry, protection and control along with replacement of damaged cabling/wiring. Providing of new flood lights at 132KV switchyard, divisional stores complete job including replacement of damaged cables/wiring,
protection & control and providing of protection and control of 3x35 MW LJHP power house |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155579_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
8.56 Lacs |
60 Days |
E-NIT |
Corrigendum for "Inspection and Relay Testing of complete control & protection system of power house for 3 x 35 MW
LJHP power house" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155578_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
5.21 Lacs |
30 Days |
E-NIT |
Corrigendum for "Refilling /Top up of SF6 gas to all the 132 KV breakers along with its supply/handling etc for LJHP complete testing of leakages, necessary repairs,
Alignment and refilling of spare SF6 gas cylinders and providing of SF6 gas leakage detector for 3 x 35 MW LJHP power house" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155577_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
5.50 Lacs |
30 Days |
E-NIT |
Corrigendum for "Replacement of old 800 sq.mm power cable 11kv grade by new 1000 sq.mm (single core) of unit-1st of power house along with indoor/outdoor kits, complete termination, fittings, dressings etc and dismantling of old deteriorated/damaged overheated cables (cables available, 300 meters) including
supply and fixing of bakelite sheet(20mm) for cable holdings of existing cables for 3x35mw ljhp power house" |
GD/LJHP/Tech/970-75 |
03.01.2022 |
2021_SPDC_155575_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
5.85 Lacs |
60 Days |
E-NIT |
Corrigendum for "Providing , installation ,testing and commissioning of additional equipments like hard drives, LED, media convertors etc required for smooth functioning CCTV system of PH including replacement, repairs and restoration of CCTV system at
barrage for providing proper surveillances for LJHP 3 x 35 MW, Baramulla" |
GD/LJHP/Tech/964-69 |
03.01.2022 |
2021_SPDC_155593_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
4.23 Lacs |
30 Days |
E-NIT |
Corrigendum for Testing/Refilling of fire extinguishing system CO2 plant including refilling of CO2 bank and portable
fire extinguishers & other allied works at 3 x 35 MW LJHP power house, Baramulla |
GD/LJHP/Tech/964-69 |
03.01.2022 |
2021_SPDC_155592_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
3.38 Lacs |
30 Days |
E-NIT |
Corrigendum for "Printing of Log Sheets, Gate Passes, Visitors Book, Requisition Form etc for LJHP" |
GD/LJHP/Tech/964-69 |
03.01.2022 |
2021_SPDC_155591_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
2.00 Lacs |
30 Days |
E-NIT |
Corrigendum for De-weeding of store, switchyard, etc near LJHP house in 3x35 mw LJHP power house, Baramulla |
GD/LJHP/Tech/964-69 |
03.01.2022 |
2021_SPDC_155585_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
1.00 Lacs |
30 Days |
E-NIT |
Corrigendum for "Illumination of Barrage & Forebay by providing and fixing of 30 numbers flood lights along with control and
protection panels, laying of cables & other allied accessories in 3x35 MW LJHP Baramulla" |
GD/LJHP/Tech/964-69 |
03.01.2022 |
2021_SPDC_155583_1 |
LJHP |
ELECTRICAL |
LJHP Power house Chahla |
2.21 Lacs |
30 Days |
E-NIT |
E-Nit No:08 of 2021 "Construction of balance work of Corporate Office Complex of JKPDC at Rajbagh, Srinagar, Kashmir-JK" |
E-NIT 08 of 2021 Dt.01.01.2022 |
01.01.2022 |
|
CAPITAL WORKS |
CIVIL AND ELECTRICAL WORKS |
Rajbagh Srinagar,JK |
22.64 Crores |
18 Calendar months |
E-NIT |
Short Term E-Nit No:- GD/LJHP/32 of 2021-22 "De-weeding of store, switchyard, etc near LJHP house
in 3x35 mw LJHP power house, Baramulla" |
GD/LJHP/Tech/870-76 |
30.12.2021 |
2021_SPDC_155585_1 |
LJHP |
CIVIL |
LJHP Powerhouse Chahla JK |
Rs 1.00 Lacs |
30 days |
E-NIT |
Short Term E-Nit No:- GD/LJHP/31 of 2021-22 "Illumination of Barrage & Forebay by providing and fixing of 30 numbers
flood lights along with control and protection panels, laying of cables & other allied accessories in 3x35 MW LJHP Baramulla" |
GD/LJHP/Tech/863-69 |
30.12.2021 |
2021_SPDC_155583_1 |
LJHP |
ELECTRICAL |
Barrage LJHP Powerhouse |
Rs 2.21 Lacs |
30 days |
E-NIT |
E-Nit N0:GD/LJHP/30 of 2021-22 "Complete Repair/Renovation of 03 No of head regulator gates by way of
replacement of reduction gear boxes roller bushes, side plates, seal plates & rubber seals, joining plates, guide
rollers etc at head works Barrage" |
GD/LJHP/Tech/854-62 |
30.12.2021 |
2021_SPDC_155581_1 |
LJHP |
ELECTRICAL |
Forebay Power House JK |
Rs 11.74 lacs |
30 days |
E-NIT |
E-Nit No:10 of 2021 "PROCUREMENT OF AUTOMATION
SPARES FOR 450 MW POWER HOUSE
OF BHEP-II AS PER TECHNICAL
SPECIFICATIONS" |
GEN/BHEP-II/10 of 2021 |
29.12.2021 |
2022_SPDC_155985_1 |
Baglihar HEP Stage II |
ELECTRICAL |
Chanderkote Ramban,JK |
Rs 11,80,387 |
60 days from the date of issue of LOA |
E-NIT |
E-Nit No:09 of 2021 "PROCUREMENT OF COOLING
WATER SYSTEM, DEWATERING AND
DRAINAGE SYSTEM SPARES FOR 450
MW POWER HOUSE OF BHEP-II AS
PER TECHNICAL SPECIFICATIONSJK" |
GEN/BHEP-II/09 of 2021 |
29.12.2021 |
2022_SPDC_155983_1 |
Baglihar HEP Stage II |
HYDROMECHANICAL |
Chanderkote Ramban,JK |
Rs 72,61,605 |
60 days from the date of issue of LOA |
E-NIT |