Name of Power House Configuration Installed Capacity in MW

STATE SECTOR

Jhelum River Basin

Lower Jhelum

3 x 35

105

Upper Sindh-I

2x11.3

22.6

Ganderbal

2x3+2x4.5

15

Upper Sindh-II

3x35

105

Pahalgam

3x1.5

4.5

Karnah

2x1

2

Chenab Basin

Chenani-I

5x4.66

23.30

Chennai-II

2x1

2

Chennai-III

3x2.5

7.50

Bhaderwah

3x0.5

1.5

Baghlihar Power Project

3x150 + 3x150

900

Ravi Basin

Sewa-III

3x3

9

Indus Basin

Iqbal

3x1.25

3.75

Hunder

2x0.20

0.40

Sumoor

2x0.05

0.10

Igo-Mercellong

2x1.50

3

Haftal

2x0.50

1

Marpachoo

3x0.25

0.75

Bazgo

2x0.15

0.30

Stakna

2x2

4

Sanjak

1 x 1.26

1.26

Total: 1211.96 MW

CENTRAL SECTOR

Salal HEP

6x115

690

Uri -I

4x120

480

Dul-Hasti

3x130

390

Uri-II

2x120

240

Chutak

4x11

44

Nimo-Bazgoo

3x15

45

Sewa-II

3x40

120

Total:2009 MW